Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.2 LAccepted-AOC | ₹79.2 L Quoted ₹5,205 | L1 | Accepted-AOC 40 percent of tender value |
| 2 | L2₹23.8 L+₹6 (0.12%)Accepted-AOC | ₹23.8 L+₹6 (0.12%) Quoted ₹5,211 | L2 | Accepted-AOC 12 percent of tender value |
| 3 | L3₹23.8 L+₹14 (0.27%)Accepted-AOC | ₹23.8 L+₹14 (0.27%) Quoted ₹5,219 | L3 | Accepted-AOC 12 percent of tender value |
| 4 | L4₹23.8 L+₹55 (1.06%)Accepted-AOC | ₹23.8 L+₹55 (1.06%) Quoted ₹5,260 | L4 | Accepted-AOC 12 percent of tender value |
| 5 | L5₹23.8 L+₹65 (1.25%)Accepted-AOC | ₹23.8 L+₹65 (1.25%) Quoted ₹5,270 | L5 | Accepted-AOC 12 percent of tender value |
Tender Value
Refer Docs
EMD Value
₹4.0 L
Closing Date
8 Jun 2020, 5:00 pmClosed
DY CHEIF ENGINEER, SUB URBAN CIRCLE AMRITSAR
DY CHEIF ENGINEER, SUB URBAN CIRCLE AMRITSAR
LABOUR OUTSORCNG FOR ELECTRICAL WORKS
2020_POWER_47497_1
01/SE/DS, Suburban Circle Amritsar/2020-21
Open Tender
Electrical Works
Item Rate
365 days
AMRITSAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
AMRITSAR
₹4.0 L
Yes
17 Nov 2020
11 May 2020
9 Jun 2020
11 May 2020
8 Jun 2020
11 May 2020
Amount
PSPCL Labour schedule rate + - _______% Premium ( Maximum premium is 5300%)
For the execution of works comprising only labour component for execution of various works such as releasing of AP T/Well connection, Deloading of overloaded T/F, Bifurcation of feeders, Releasing ISC/GSC Connection involving construction of HT/LT line and distribution T/Fs., Shifting of Meters outside consumers premises, Earthing of Distribution T/F., Erection of New 11 kv , or any development work to be executed on labour rate during year 2020-21 All Divisions under DS Circle, Gurdaspur. 1. The tenderer should quote the %age premium on PSPCL labour rates inclusive all taxes except( GST) 2 GST should be exclusive of rates 3 Rates for fabrication of MS items will be applicable as per rates approved by Zonal Level Committee of CE Border Asr. 4 Material will be provided by PSPCL 5 Dismantled material if any will be returned to store by the contractor within 15 days from the completion of work through JE concerned. Transportation shall be provided by the tenderer without any extra cost.
NEW DHILLON ELECTRICAL WORKS
M/S. SARKARIA ELECTRICAL
M/S. PANDHER ELECTRICAL AND ENGINEERING WORKS
M/S. S.GEE ELECTRICALS
M/S. VEE KAY ELECTRICALS
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .