Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.03% | ₹14.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹14.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹14.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹14.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.9 L
EMD Value
₹15,000
Closing Date
17 Jun 2026, 3:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
2 Reparing OF ROOM and GARRAJ IN CIRCUIT HOUSE KANPUR NAGAR
2026_MSME_1157982_6
483/EE4/26-27
Open Tender
Civil Works
Percentage
90 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineering UPSIC KANPUR
₹15,000
3 Jul 2026
15 Jun 2026
17 Jun 2026
15 Jun 2026
17 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work : | - | - | - | - |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. DSR 15.7 | 19 | Cum. | 1,585.01 | ₹30,115.19 |
| 3 | Earth work in excavation in foundation in ordinary soil up to 1.5 mtr lift & 30.0 mtr lead etc all complete. | 32.82 | Cum. | 200.26 | ₹6,572.53 |
| 4 | 1:4:8 (1 cement :4 coarse sand : 8 graded stone aggregate 40 mm nominal size DSR 4.1.8 | 4.86 | Cum. | 5,240.78 | ₹25,470.19 |
| 5 | Providing and laying cement concrete Retaining Walls return wall Wall (any thickness) including attached pilaster coloumns piers abutments pillars posts struts buttresses string or lacing course parapets coping bed blocks plain window sills fillets sunken floor etc . up to floor five level excluding the cost of centring shuttering and finishing.. 20 mm nominal size ...... Complete item DSR1:1.5:3 | 3.08 | Cum. | 8,349.67 | ₹25,716.98 |
| 6 | Providing and laying cement concrete Retaining Walls return wall Wall (any thickness) including attached pilaster coloumns piers abutments pillars posts struts buttresses string or lacing course parapets coping bed blocks plain window sills fillets sunken floor etc . up to floor five level excluding the cost of centring shuttering and finishing.. 20 mm nominal size ...... Complete item DSR1:1.5:3 | 7.1 | Cum. | 8,349.67 | ₹59,282.66 |
| 7 | MS or iron work in plain work such as reinforced concrete wrought to required shape as necessary including bending for proper completion of the work.As Per Analaysis | 1,198.73 | Kg | 82.4 | ₹98,775.35 |
| 8 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in foundation and plinth in: cement mortar 1:6 DSR 6.1.2 | 7.44 | Cum. | 5,487.17 | ₹40,824.54 |
| 9 | M-150 brick work in 1:4 one cement and 4 fine sand mortar in superstructure including supply of all materials, labour and tools and plants etc. required for proper completion of the work. | 61.49 | Cum. | 7,189.04 | ₹4,42,054.07 |
| 10 | 12 mm thick 1:4 cement coarse sand plaster ….. Complete item | 424.16 | Sqm | 274.93 | ₹1,16,614.31 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
BOQ_2175290.xls
BOQ • 0.28 MB
Corrigendum483SunilSir.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].