Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Mar 2022, 4:30 pmClosed
Er Rajesh Gupta
EXECUTIVE ENGINEER REW DIVISION RAMBAN
AS PER NIT
2022_RDPR_162204_15
e fresh NIT 76 of REW Ramban
Open Limited
Civil Works
Item Wise
30 days
RAMBAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW DIVISION RAMBAN
Exempted
14 Mar 2022
26 Feb 2022
7 Mar 2022
26 Feb 2022
5 Mar 2022
26 Feb 2022
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
Dry stone pitching on horizontal surface
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work up to plinth level (1:3:6) mix with 30% Boulders ( 1 cement :3coarse sand :6 graded stone aggregate 20 mm nominal size) crushed
Providing and laying in position Reinforced cement concrete work in walls ( any thickness) including attached pilaster buttressess, plinth and string courses , fillets , columns, pillars , piers, abutments, posts and struts , etc up to floor five level excluding cost of centring shuttering finishing and reinforcement ( 1 cement :2coarse sand :4 graded stone aggregate 20 mm nominal size) crushed
Providing and laying Reinforcement cement concrete 1:1.5 :3 (1 cement:1 1.5 coarse sand :3 graded stone agg. 20 mm nominal ) in suspended floors, balconies, landings, and stair cases having slope upto 15, excluding the cost of centring shuttering, All work up to floor v level.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . TMT bars.Including all leads, lift and carriage complete
Centering and shuttering including strutting, propping etc. and removal of formwork for Foundations, footings, bases of columns, etc.
Centering and shuttering including strutting, propping etc. and removal of formwork for walls
Centering and shuttering including strutting, propping etc. and removal of formwork for slab
Centering and shuttering including strutting, propping etc. and removal of formwork for edges of slab
12mm thick cement plaster of mix 1:6 (1 cement :6 fine sand )
Instalation of signboard
anchal singh
PALVI BHUTYAL
SAPNA DEVI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .