Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹1.5 LAccepted-AOC | ₹1.5 L | L2 | Accepted-AOC Qualified in AOC |
| 2 | L1₹1.4 LRejected-AOC | ₹1.4 L | L1 | Rejected-AOC Qualified in AOC |
| Sl No | Description | Qty | Unit | CAPITAL ENGINEERING AND CONSTRUCTIONS L2 | Veerajaconstructions L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth as per SS 20B | 300 | Rm | 210 ₹63,000 | 207.5 ₹62,250 |
| 2.00 | Supply and Following of 63mm dia PVC Pipe Including Cost and Conveyance etc Complete. 4 KSC | 300 | Rm | 145 ₹43,500 | 142 ₹42,600 |
| 3.00 | Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete. | 300 | Rm | 25 ₹7,500 | 22 ₹6,600 |
| 4.00 | Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. . | 300 | Rm | 30 ₹9,000 | 28.25 ₹8,475 |
| 5.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 22,140 ₹22,140 | 21,586.5 ₹21,586.50 |
Tender Value
₹1.4 L
EMD Value
₹1,500
Closing Date
12 Jan 2026, 3:00 pmClosed
The President Cheyyur
Panchayat office Building at Cheyyur Panchayat
1. Providing Main Pipe Line to Palayarmadam 309m OHT at Cheyyur Panchayat Lathur Panchayat Union.Estimate.1.44 Lakhs,15th Finance Tied.2025/26
2026_RDTN_639930_1
Tender ref No.2752/2025/A6 ADP Date.03.12.2025
Open Tender
Civil Works
1. Providing Main Pipe Line to Palayarmadam 309m O
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,500
Yes
14 Jan 2026
7 Jan 2026
12 Jan 2026
7 Jan 2026
12 Jan 2026
7 Jan 2026
Amount
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth as per SS 20B
Supply and Following of 63mm dia PVC Pipe Including Cost and Conveyance etc Complete. 4 KSC
Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete.
Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. .
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CAPITAL ENGINEERING AND CONSTRUCTIONS (BID ID -1559936)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Technical.pdf
Tender Documents • 0.30 MB
BOQ_766167.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid