| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC AT UPPER BOOTY NEAR KRISHNA NURSING HOME P S SADAR RANCHI JHARKHAND 835217 | RANCHI | JHARKHAND | 835217 | ₹16.7 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹18.9 LRejected-Finance FLAT NO 2B SWARANA PALACE GAMHARIYA SERAIKELA KHARSAWAN 832108 JHARKHAND | GAMHARIYA | SERAIKELA KHARSAWAN | JHARKHAND | 832108 | ₹18.9 L | L2 | Rejected-Finance Due to L2 |
Tender Value
₹17.9 L
EMD Value
₹35,900
Closing Date
24 Apr 2026, 3:15 pmClosed
General Manager Transmission Zone VI Deoghar
132/33 kV Grid campus Dabargram Deoghar
Carrying out routine patrolling Preventive Breakdown Maintenance of Jamtara Maithon (DVC) TL LILO of Jamtara Madhupur TL at GSS Kundhit from LILO point to GSS Kundhit under TD Deoghar 2 for the period from 01.05.2026 to 31.03.2027
2026_JSEB_112375_1
eNIT No. 07/PR/JUSNL/2026-27
Open Tender
Electrical Works
132/33 kV GSS
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹35,900
Yes
3 Jun 2026
4 Apr 2026
25 Apr 2026
4 Apr 2026
24 Apr 2026
4 Apr 2026
Routine Monthly Patrolling of 132 kV Transmission Lines including tree prunning, repositioning of OPGW/Earth wire, checking, tightening & positioning of fasteners etc and back filling of Earth errosion of tower legs along the corridor and vehicle with fuel & driver required for the work under Transmission Division, Deoghar- 2:-
Trip top Patrolling of 132kV Transmission lines including tree prunning along the corridor with complete checking and sorting out the minor causes of tripping and vehicle with fuel & driver required for the work.
Break-Down and Scheduled Maintenance of Transmission lines.
Tightening of jumper in transmission tower:-
Mobilisation of Labourers (one gang should consist of 20 person)
Demobilisation of Labourers (one gang should consist of 20 person)
Transportation of other GSS equipments, transmission line materials inclusive of ERS including loading, unloading of the equipment/materials by Small / Medium size truck from transmission central store, Deoghar or other GSS to different sites/locations of line
Measurement of Earth Footing Resistance of Transmission Line Towers in the presence of E/I
Sub-Total
Estimated Cost
GST @ 18 % on Total
Labour Cess @1% on (Total + GST)
Grand Total Rs.
Say Total
Rate analysis for Routine and Trip Top patrolling of 132 kV and above capacity for Transmission line.
Skilled
Unskilled/Helper/Khalasi
Hiring of vehicle with Driver
Sub Total
EPF @ 12% + ESIC @ 3.25% + Adm Charge 1% on Sl. no.- 1 & 2
Contractor's profit @ 10% and T&P @ 03% on Sl. no.- 1 & 2
Total
Total Amount for 9km patrolling work
Rate per km
Skilled
Semi Skilled/Helper/khalasi
Hiring of vehicle with Driver
Total amount involved to complete the patrolling work
EPF @ 12% + ESIC @ 3.25% + Adm Charge 1% on Sl. no.- 1 & 2
Contractor's profit @ 10% and T&P @ 03% on Sl. no.- 1 & 2
Total
Total Amount for 27km patrolling work
Rate per km
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQJamtara_associated_line_eNIT07.pdf
Tender Documents • 0.69 MB
PricePartJamtara_eNIT07.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid