| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAdmitted-Finance | ₹9.3 L | L1 | Admitted-Finance |
| 2 | L2₹10.9 L+₹1.6 L (17.0%)Admitted-Finance | ₹10.9 L+₹1.6 L (17.0%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.KANNIYAPPAN L1 | K.MADHUKAR L2 |
|---|---|---|---|---|---|
| 1.00 | Collection of garbage / soil / Rock / refused materials like jungle Cutting materials, wild vegetation and periodic cleaning of dust bins, Dumped debris road sides of FBTR / DFRP Complex areas conveying to dumping yard, including loading, unloading, dumping, and levelling in dumping yard etc. including required labour, tools, hand saw, arc and mechanical transport with lead beyond 4 .00 km upto 5.00 kilometres as directed by the Engineer -in-charge. Note: This item operates for only manual loading Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. and 50% in respect of garden wastes, tree branches & Bin Wastes 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | 200 | Cu.m. | 320 ₹64,000 Lowest | 350 ₹70,000 |
| 2.00Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||
| 2.01 | Lead charges for lead Exceeding 2 kilometre but not exceeding 3 kilometre | 50 | Cu.m. | 250 ₹12,500 Lowest | 300 ₹15,000 |
| 3.00Cutting and trimming the branches of the trees of below mentioned girth size of maximum height up to 15.00 metre height from ground level with handling the cut out portion secondary stems, trunk, roots etc., of the Banyan Tree / Rain tree / assorted tree, including required labour, tools , hand saw, arc and disposing using mechanical transport of all the cut branches to dumping yard with in a lead of 5.0km including the lorry/tipper and the labours for loading and unloading the branches of tree, leaves etc., and as directed by the Engineer-in-charge. Note: This item operates only for rooted trees | |||||
| 3.01 | Below 200mm girth | 50 | Nos. | 160 ₹8,000 Lowest | 175 ₹8,750 |
| 3.02 | Above 200mm, upto 300mm girth | 200 | Nos. | 200 ₹40,000 Lowest | 250 ₹50,000 |
| 3.03 | Above 300mm, upto 600mm girth | 100 | Nos. | 200 ₹20,000 Lowest | 250 ₹25,000 |
| 3.04 | Above 600mm upto 1200mm girth | 50 | Nos. | 200 ₹10,000 Lowest | 260 ₹13,000 |
| 3.05 | Above 1200mm upto 1800mm girth | 20 | Nos. | 800 ₹16,000 Lowest | 900 ₹18,000 |
| 3.06 | Above 1800mm upto 2400mm girth | 10 | Nos. | 1,000 ₹10,000 Lowest | 1,250 ₹12,500 |
Tender Value
₹12.9 L
EMD Value
₹25,900
Closing Date
13 May 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Jungle clearance and periodical cleaning of dust bins at RML and FBTR Complex in IGCAR, Kalpakkam during the year of 2026-2027.
2026_IGCAR_906442_1
CEG/IGC/2184/2026
Open Tender
Civil Works
Item Rate
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹25,900
10 Jun 2026
29 Apr 2026
14 May 2026
30 Apr 2026
13 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Collection of garbage / soil / Rock / refused materials like jungle Cutting materials, wild vegetation and periodic cleaning of dust bins, Dumped debris road sides of FBTR / DFRP Complex areas conveying to dumping yard, including loading, unloading, dumping, and levelling in dumping yard etc. including required labour, tools, hand saw, arc and mechanical transport with lead beyond 4 .00 km upto 5.00 kilometres as directed by the Engineer -in-charge. Note: This item operates for only manual loading Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. and 50% in respect of garden wastes, tree branches & Bin Wastes 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | 200 | Cu.m. | - | - |
| 2Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||
| 2.01 | Lead charges for lead Exceeding 2 kilometre but not exceeding 3 kilometre | 50 | Cu.m. | - | - |
| 3Cutting and trimming the branches of the trees of below mentioned girth size of maximum height up to 15.00 metre height from ground level with handling the cut out portion secondary stems, trunk, roots etc., of the Banyan Tree / Rain tree / assorted tree, including required labour, tools , hand saw, arc and disposing using mechanical transport of all the cut branches to dumping yard with in a lead of 5.0km including the lorry/tipper and the labours for loading and unloading the branches of tree, leaves etc., and as directed by the Engineer-in-charge. Note: This item operates only for rooted trees | |||||
| 3.01 | Below 200mm girth | 50 | Nos. | - | - |
| 3.02 | Above 200mm, upto 300mm girth | 200 | Nos. | - | - |
| 3.03 | Above 300mm, upto 600mm girth | 100 | Nos. | - | - |
| 3.04 | Above 600mm upto 1200mm girth | 50 | Nos. | - | - |
| 3.05 | Above 1200mm upto 1800mm girth | 20 | Nos. | - | - |
| 3.06 | Above 1800mm upto 2400mm girth | 10 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2184FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
2184technicalbid.pdf
Tender Documents • 2.10 MB
2184Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
BOQ_953088.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .