| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-Finance | ₹7.2 L | L1 | Accepted-Finance OK |
| 2 | L2₹7.2 L+₹3,294 (0.46%)Rejected-Finance BADIYAR A PO NANDPUR TEHSIL JUBBAL DISTT SHIMLA H P | JUBBAL | SHIMLA | HIMACHAL PRADESH | ₹7.2 L+₹3,294 (0.46%) | L2 | Rejected-Finance OK |
Tender Value
₹7.0 L
EMD Value
₹14,000
Closing Date
23 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
HPPWD Jubbal
R/R Damages on link road Turan to Bakhan km 0/00 to 1/00 SH Construction of B/wall at Rd 0/330 to 0/370
2026_PWD_141397_1
E-Tender-2026-27-6155-58,Dated 17.08.2026
Open Tender
Civil Works
Percentage
Turan
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹14,000
29 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
23 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | 167.6 | Per Cubic metre | 490 | ₹82,124 |
| 2 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including all leads and lifts as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge | 187.5 | Per cubic metre | 3,300 | ₹6,18,750 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_209882.xls
BOQ • 0.23 MB
sbd.pdf
Tender Documents • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .