| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance | ₹1.5 Cr | L1 | Accepted-Finance Found L1 |
| 2 | L2₹1.5 Cr+₹3.0 L (2.00%)Accepted-Finance | ₹1.5 Cr+₹3.0 L (2.00%) | L2 | Accepted-Finance Found L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Record Not Found Correct |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
9 Aug 2024, 12:00 pmClosed
Superintending Engineer, EDC, Lalitpur
Behind LIC Office, Jhansi Road, Lalitpur
Increasing capacity of various transformers and installation of extra transformer, earthing, plinth, fencing work under the area of EDC, Lalitpur under Business Plan 2024-25
2024_DVVNL_922749_3
47/EDC(L)/2023-24
Open Tender
Electrical Works
Percentage
90 days
Lalitpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Superintending Engineer, EDC, Lalitpur
₹1.6 L
24 Aug 2024
20 Jul 2024
9 Aug 2024
20 Jul 2024
9 Aug 2024
20 Jul 2024
Cartage of Following Transformer including loading, unloading from ESC, Lalitpur to Dump Site of work.
Cartage of PCC Pole /STP Pole including loading & unloading from ESC, Lalitpur to dump site of work
Cartage of line material including loading & unloading from ESC, Lalitpur to dump site of work
Erection of Single pole and fixing of all accessories as per RESSPO Norms with concreting (Concreting material, Nut & Bolt Provided by Contractor)
Erection of Double pole and fixing of all accessories i.e. Top, Dropper Channel, Base Angle, Fuse Set etc. as per RESSPO Norms with concreting (Concreting, Nut & Bolt Provided by Contractor)
Fixing & nozelling of stay rod with grouting (grouting material shall be arrange by contractor)
Earthing by earthing rod
Laying of ABC (3x95+1x95+1x16)Sqmm
Laying of ABC (3x50+1x35+x1x16)Sqmm
Making of Plinth size 2x2x1.5m As per RESSPO Manual (All material provided by Contractor)
Installation of Transformer on double pole/Plinth and connect with line in all respect
Dismantling and safely back carriage of 10/16 kVA Transformer from site to Store
Dismantling and safely back carriage of 100 kVA Transformer from site to Store
Chemical earthing of Newly installed 63kVA, 100kVA & 250kVA T/f (All material provided by Contractor) having minimum guarantee period 5years
Fencing (mesh type) of 250kVA transformer for safety purpose (All material provided by Contractor)
Supply of Following material
Stay Clamp with nut & bolt
DP Clamp with Nut & Bolt
Holding Clamp with nut & bolt
F Clamp with nut & bolt
LT Pin Clamp for PCC Pole
Alluminium Lug 120 Sqmm
HARVITEC ENTERPRISES PVT LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .