Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-Finance | ₹1.2 Cr | 1 | Accepted-Finance Accept |
| Sl No | Description | Qty | Unit | BHARAT MATA CABLEWAYS SOLUTIONS LLP L1 |
|---|---|---|---|---|
| 1.00a) Operating the Monocable Fixed Grip Jig Back Type Material Ropeway Systemof 1.5 Tons/hour with required staff as required and as directed by the Joint Commissioner/ Executive Officer and the Ropeway Expert / Safety Committee of ADST, Palani. (Normally Two shifts operation and on Festival days - round the clock operation is envisaged). b) Comprehensive Maintenance of the Material Ropeway System including Supply of all emergency and Operating Spares such as Main Rope, Drive, Plumber block bearings, Gearbox, Line sheaves etc., Towers & structure Maintenance, Insurance, ESI, EPF etc., for the workers and staffs excluding both terminal stations & Ropeway alignment area lightings. Vertical Height of both the Stations - 120 Metres Length of the Ropeway - 270 Metres | ||||
| 2.00 | First Year | 12 | Months | 2,59,875 ₹31.2 L |
| 3.00 | Second Year | 12 | Months | 2,85,863 ₹34.3 L |
| 4.00 | Third Year | 12 | Months | 3,14,449 ₹37.7 L |
| 5.00Sub Total | ||||
| 6.00 | GST @ 18% | 1 | GST | 18,58,003.92 ₹18.6 L |
Updated dates
Tender Value
₹85.0 L
EMD Value
₹53,000
Closing Date
23 Dec 2025, 3:00 pmClosed
Joint Commissioner/Executive Officer
Joint Commissioner /Executive Officer, Arulmigu Dhandayuthpani Swamy Temple, Palani
OPERATION and COMPREHENSIVE MAINTENANCE OF MATERIAL ROPEWAY SYSTEM AT ARULMIGU DHANDAYUTHAPANI SWAMY TEMPLE, PALANI INCLUSIVE OF ALL MEN and MATERIALS FOR THREE YEARS
2025_HRCE_603241_1
3/2025-2026
Open Tender
Maintenance Works
1095 days
Giriveethi, Palani
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹53,000
13 Feb 2026
12 Sept 2025
23 Dec 2025
12 Sept 2025
23 Dec 2025
18 Sept 2025
a) Operating the Monocable Fixed Grip Jig Back Type Material Ropeway Systemof 1.5 Tons/hour with required staff as required and as directed by the Joint Commissioner/ Executive Officer and the Ropeway Expert / Safety Committee of ADST, Palani. (Normally Two shifts operation and on Festival days - round the clock operation is envisaged). b) Comprehensive Maintenance of the Material Ropeway System including Supply of all emergency and Operating Spares such as Main Rope, Drive, Plumber block bearings, Gearbox, Line sheaves etc., Towers & structure Maintenance, Insurance, ESI, EPF etc., for the workers and staffs excluding both terminal stations & Ropeway alignment area lightings. Vertical Height of both the Stations - 120 Metres Length of the Ropeway - 270 Metres
First Year
Second Year
Third Year
Sub Total
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_721143.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 3.01 MB
TenderDocument.pdf
Tender Documents • 0.34 MB
BOQ_721143.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid