Tender Value
Refer Docs
EMD Value
₹3,400
Closing Date
28 Mar 2023, 1:00 pmClosed
SE
EDC II FATEHABAD
bq work
2023_DVVNL_788834_1
TNo 77
Open Tender
Miscellaneous Works
Lump-sum
30 days
fatehabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹3,400
4 Apr 2023
23 Mar 2023
28 Mar 2023
23 Mar 2023
28 Mar 2023
23 Mar 2023
Carriage of Following material from store center agra to site of work including its loading and unloading at the respective ends.(Distanse 0-60 km)
11 Mtr STP Pole
9 Mtr Pcc pole
8.5 Mtr Pcc pole
carriage of 16 MVA T/F
11 kv XLPE cable
Line material viz ACSR Dog conductor, G.I. MS top, X Arm holding clamp,disc insulator, Disc fitting, F bracket, T-off channel, cross arm angle, channel, insulators, Pin insulater and all material of line.
Erection of single pole of 11 Mtr long STP poles, including fixing of accessories for 33 kv HT line as per RESPO manual and as per direction of Engineer Incharge.
Erection of single pole of 09 Mtr long Pcc poles, including fixing of accessories for 33 kv HT line as per RESPO manual and as per direction of Engineer Incharge.
Erection of single pole of 8.5 Mtr long Pcc poles, including fixing of accessories for 11 kv HT line as per RESPO manual and as per direction of Engineer Incharge.
Erection of double pole of 11 Mtr long STP poles, including fixing of accessories for 33 kv HT line as per RESPO manual and as per direction of Engineer Incharge.
Erection of Tri pole of 11 Mtr long STP poles, including fixing of accessories for 33 kv HT line as per RESPO manual and as per direction of Engineer Incharge.
Erection of Tri pole of 09 Mtr long Pcc poles, including fixing of accessories for 33 kv HT line as per RESPO manual and as per direction of Engineer Incharge.
Making HT T-off connection on exiting mains labour T&P and carrier etc required for proper complition of work.
Erection of stays in 1:4:8 ratio cement, sand and stone ballast, its tighting, binding, nozelling etc of stay wire with stay and stay clamp of pole as per site requirement.
Fixing of earthing rod including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying sagging stringing and binding and jumpering of ACSR Dog Conductor, condutor of for construction of 11 KV line/LTof ACSR Wesal Conductor,
ACSR Dog Conductor,Laying sagging stringing and binding and jumpering of ACSR Dog Conductor, condutor of for construction of 11 KV line/LT
Grouting of STP Pole
Grouting of 9 Mtr Pole
Grouting of 8.5 Mtr Pole
installation of 11/.4 16 kva T/F on existing pole structure.
opening of 33 kv side jumpers and opening of 11 kv cable connections of existing 5 MVA power T/F placed on plinth at 33/11 kv S/s Ahran opeing of radiators and neutral using gas/etectirc cutter removing the T/f from plinth and placing at suitable safe place inside/outside the S/s premises/switchyard.
Dismantling of existing 11 kv XLPE cale 3*300 sqmm form cale trench coming in the way of shifting 5 kva T/f
Provind and making cable box 3x300 sqmm 11 kv XLPE cable.
Earthing of 10 MVA tranformers with body & netural by GI strip and welding plinth.
carriage of 05 mva T/f form site to store agra.
SAMADHIYA ENTERPRISES
VIJAY ELECTRICAL
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .