Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ACCEPT |
| 2 | Accepted-Technical | Accepted-Technical ACCEPT |
| 3 | Accepted-Technical | Accepted-Technical ACCEPT |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
16 Feb 2026, 1:00 pmClosed
SE AND PM JAISALMERE
SE AND PM JAISALMER
Construction of various watershed development structures in Project area of Jaisalmer Block SAM (MJSA 2.0 (Phase II)
2026_WDSC_534902_1
16/2025-26/3121/30-01-2026
Open Tender
Miscellaneous Works
Percentage
180 days
JAISALMER
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
SE CUM PM WDSC JAISALMER/ MDRISL JAIPUR
₹2.3 L
Yes
SE AND PM JAISALMER
9 Mar 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
9 Feb 2026
Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect (SAM BSR RD&PR 2025-26)
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. (SAM BSR RD&PR 2025-26), 2A
Cement concrete mix (1:4:8) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm (SAM BSR RD&PR 2025-26)
R.R. stone Masonry (using R. R. stones where stones to be not less than 15 cm in size in any direction) for foundation including all leads of all construction materials including curing etc. complete in 1: 6 Cement Mortar (SAM BSR RD&PR 2025-26)
50mm thick Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 20mm,
25 mm thick cement plaster on wall with 1:4 ratio with joint scraping and regular leveling for 14 days (SAM BSR RD&PR 2025-26)
Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio (SAM BSR RD&PR 2025-26)
Supply of stones lintels and setting them in mortar used in masonry .100 to 150 mm thickness
P/L stone slabs, filling with cement in 1:4 ratio with top and bottom joints with stone chips, 2.4 m. from 3.0m span (SAM BSR RD&PR 2025-26)
Leveling the excavated soil, in the Catchment area and pouring water and ramming with a rammer.(SAM BSR RD&PR 2025-26)
Cement concrete mix (1:5:10) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm including watering, loading and un-loading wherever required complete in all respect.(SAM BSR RD&PR 2025-26)
Unpolished rough kota stone / Jaisalmeri stone should be leveled directly on top of 20 mm thick cement mortar 1:4 and joints should be filled with cement mortar 1:3 and flush tipped.
Supply and installation of iron gratting 125mm diameter
Dhakkan GI Plain Sheet
Laying of 110 mm diameter PVC pipe along with other necessary materials
Sign Board Granite (PWD BSR )
Mkxcsfyx dk;Z 5 lseh ls 7-5 lseh xgjkb rd
taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. with initial lead of 250m and lift up to 1.5m including dressing, loading and un-loading wherever required complete in all respect. (Excluding charges for compaction and watering) BSR RD&PR 2023-24
Compaction of earth By manually or plain roller. (density 90% of Proctor) (WRD BSR 2023 )
Watering of earth including cost of carriage of water when source of water is up to 3 Km (WRD BSR 2023 )
15 to 30 cm hammered single stone pitching with all lift, with supply.
Morrum, building debris, lime, gravel, stone ballast less than 40 mm nominal size for various distance transportation including loading, unloading and stacking. (The length of the transport will be calculated from the nearest route and not by road) lead upto 3Km
R.R. stone Kharnja in 1: 6 Cement Mortar and laid in position complete including all leads of all construction materials including curing and finishing(SAM BSR RD&PR 2024-2025)
Sewan grass seeds sowing on ridge in 03 row
Sewan grass seeds
Supply and laying of HDPE Geomembrane 500 micron,excluding GST (Horticulture letter 39-134 Date 20.04.2023)
Laying, welding & testing of 1mm HDPE Liner (WRD BSR CH-V ITEM NO 45) 2023
150cm ऊंचाई की फेंसिंग लोहे का पोस्ट35X35X5mm के 3मी.दूरी से व 30cm जमीन में सीमेंटकंक्रीट 1:3:6(.30X.30X.60m)कोर्नर व प्रत्येक10वां पोस्ट को 35X35X5mm लोहेके पोस्ट से सपोर्ट करना,साथ में 4लाईनों में काला कांटेदारतार, 2पोस्ट के बीच जीआई. स्टेपल तार से बांधना व फिट करना सहित |विश्लेषण27 मी. लम्बाई फेंसिंग तक के लिए,मिट्टी खुदाई कार्य सहित(कंक्रीट 0.54 घमी.)
ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि।
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
BOQ_953085.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .