Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Shifting of 33KV Line in area of EDD-II Hapur (Shri Devendra Kumar Jain Field)
2022_PVVNL_752029_2
83(W)/EDCH/2022-23
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹7,500
13 Dec 2022
3 Dec 2022
9 Dec 2022
3 Dec 2022
9 Dec 2022
3 Dec 2022
3 Dec 2022 - 9 Dec 2022
Amount
FOR SHIFTING OF 33KV LINE PASSING OVER IN THE FIELED OF SHRI DEVENDRA KUMAR JAIN (KHASRA NO.-392) MASOORI, AND OTHER ASSOCIATED WORKS, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-II, UNDER EDC., HAPUR.
Carriage of line material (like Jointing Kit indoor/outdoor type, channel, agnle, clamp etc.) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 33KV XLPE Cable 3x300Sqmm from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Fabrication, erection and fixing of double pole on ST Pole 11 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 33 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Laying of overhead 33KV XLPE Cable 3x300sqmm, as per RESPO/Norms.
Laying of 33KV XLPE Cable 3x300Sqmm. undergound (Double Circuit 264x2=528mtrs) spare cable shall be left in the loop shape at both ends, after digging of earth making trench, by providing brick at three sides of cable and filling of soil and sand in cable trench, including cost of all material and labour as per RESPO/Norms.
Making and filling of 33KV Cable Jointing Kit 3x300Sqmm, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Grouting of ST supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
Dismantling of old & used ST pole 11mtrs long after digging of pit and opening of all accessories.
Removal of old & used ACSR Dog conductor on existing pole and bundling of the same.
Carriage of old & used STP from site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road.
Carriage of old & used ACSR Dog Condcutor(450mtrs.) from site of work to Electricity store center, Hapur with loading and unloading at both ends on Kachha Packka road.
Jumpering work properly as per RESPO/Norms.
M/S YASH TRADERS HAPUR
OM CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .