| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.4 Cr+₹1.7 L (1.28%)Rejected-Finance NO 39 3RD KOVALAN STREET TEACHERS COLONY ERODE 638011 | ERODE | TAMIL NADU | 638011 | ₹1.4 Cr+₹1.7 L (1.28%) | L2 | Rejected-Finance Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | THIRUMURUGAN CONSTRUCTION L1 | KONGU CONSTRUCTION AND CONTRACTORS L2 | raj engineering constructions L3 | S.Amithapatchan L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Chipping of concrete and roughening the surface as directed by the department officers. | 2,877 | m2 | 43 ₹1,23,711 Lowest | 45 ₹1,29,465 | 80 ₹2,30,160 | 60 ₹1,72,620 |
| 2.00 | Clean removal of cement plaster from walls as directed by the department officers. | 1,754 | m2 | 9 ₹15,786 Lowest | 9 ₹15,786 Lowest | 45 ₹78,930 | 40 ₹70,160 |
| 3.00 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 17 | m3 | 240 ₹4,080 | 235 ₹3,995 Lowest | 300 ₹5,100 | 280 ₹4,760 |
| 4.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct- ed by the departmental officers. | 42 | m3 | 110 ₹4,620 Lowest | 120 ₹5,040 | 250 ₹10,500 | 255 ₹10,710 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 6.2 | m3 | 1,900 ₹11,780 Lowest | 1,900 ₹11,780 Lowest | 2,000 ₹12,400 | 2,100 ₹13,020 |
| 6.00 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means | 6.3 | m3 | 6,740 ₹42,462 | 6,750 ₹42,525 | 5,500 ₹34,650 Lowest | 5,800 ₹36,540 |
| 7.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 7 | m2 | 1,100 ₹7,700 | 1,100 ₹7,700 | 1,000 ₹7,000 Lowest | 1,050 ₹7,350 |
| 8.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. using mild steel sheets of size 1200cm x 60cm and 10 BG stiffened with welded mild steel angles of size 40mm x 40mm x 5 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals. MS Channel Section (ISMC 100) shall be provided as a vertical support @1.20m C/C and with Lateral support of Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) & steel pipes of 20mm dia @ required level/spacing etc. complete complying with standard specifcation and as directed by the departmental officers. (Payment for centering shall be given after the concrete is laid) | 1,847 | m2 | 615 ₹11,35,905 | 600 ₹11,08,200 Lowest | 950 ₹17,54,650 | 1,000 ₹18,47,000 |
| 9.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - manual mix | |||||||
| 9.01 | Foundation and Basement | 294 | m3 | 9,745 ₹28,65,030 | 9,850 ₹28,95,900 | 9,100 ₹26,75,400 Lowest | 9,300 ₹27,34,200 |
Tender Value
₹1.4 Cr
EMD Value
₹78,250
Closing Date
25 Aug 2025, 3:00 pmClosed
Chief Engineer
Fishing Harbour Project Circle Fisheries and Fishermen Welfare Department Chennai-35
Renovation of Government Fish seed farm at Manjalar river in Theni District
2025_AHDF_590858_5
11/DB/F.114N/2025
Open Tender
Civil Works
Lump-sum
270 days
manjalar
as per mentioned below
4 documents required · 4 mandatory
₹0
₹78,250
Yes
10 Dec 2025
11 Aug 2025
26 Aug 2025
11 Aug 2025
25 Aug 2025
11 Aug 2025
Amount
Chipping of concrete and roughening the surface as directed by the department officers.
Clean removal of cement plaster from walls as directed by the department officers.
Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as direct- ed by the departmental officers.
Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means
Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c, etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid).
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc. using mild steel sheets of size 1200cm x 60cm and 10 BG stiffened with welded mild steel angles of size 40mm x 40mm x 5 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner, Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals. MS Channel Section (ISMC 100) shall be provided as a vertical support @1.20m C/C and with Lateral support of Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) & steel pipes of 20mm dia @ required level/spacing etc. complete complying with standard specifcation and as directed by the departmental officers. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - manual mix
Foundation and Basement
For Ground floor
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
For 1 Qtl - upto plinth/Basement level:
Add additional labour for works above plinth/Basement level in every upper floor over the preceding floor or Below Ground level of every 3.50m depth.
Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five P-sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Providing and fixing 65 mm dia "B" class GI pipe - Round Steel Pipe including supporting flat lugs at 600mm c/c including cost of pipes, flats and fillet welding etc complete as per standard specifications.
Providing and fixing M S 60mmx40mmx4mm rectangular tube and including cost of pipes, flats and fillet welding etc complete as per standard specifications.
Providing and fixing M S 40mmx20mmx2.9mm rectangular tube and including cost of pipes, flats and fillet welding etc complete as per standard specifications.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) 20mm thick
Supplying, fixing and roofing with colour galvalume sheet of 0.47mm thick with all necessary accessories such as J/V bolt and nuts of suitable length with suitable bitumen washers complete complying with standard specification and as directed by the departmental officers.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with One coats of best approved first quality and colour of synthetic enamel paint over the priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying, laying and jointing PVC pipes (having working pressure 10 kg. / sq.cm) of approved quality and best variety conforming to BIS of the following dia including cutting, threading and fixing PVC specials using PVC adhesives (but excluding cost of such specials) and fixing into wall with teak wood plugs, PVC clamps and screws making holes on the wall (or) drilling holes in the roof and making good the dismantled portion to original condition with necessary brick work / cement concrete and plastering neatly wherever necessary with necessary scaffolding charges, etc., complete complying with standard specifications. The PVC pipes shall be got approved by Executive Engineer before use on works.
25mm dia pipe
25mm coupler
25mm elbow
25mm Tee
25mm MTA
25mm FTA
Supplying and fixing of GI pipe of approved quality and best variety of B class pipe of the following sizes including fixing a GI specials above ground level upto 4 m height but excluding cost of such specials and cutting, threading of pipes and fixing with necessary teakwood plugs, clamps and making holes on the walls and making good dismantled portions etc. (TWAD SOR 2024-25)
80mm dia pipe
80mm dia Gun Metal Gate Valve
80mm dia Gun Metal Non return Valve
80mm dia GI Bend
80mm dia Flange
80mm dia Dummy (Heavy)
Supplying and fixing of 10 HP of approved brand Submersible Pump with accessories of starter, Main Switch, Panel Board etc. complete to suit the need. (The pump ste should be got approved by the EE before supply).
Sub Total Amount for above all items (excluding GST)
GST 18% for above SubTotal Amount
KONGU CONSTRUCTION AND CONTRACTORS (BID ID -1438863)
raj engineering constructions (BID ID -1439126)
S.Amithapatchan (BID ID -1439352)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_705748.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .