Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.2 L+₹10,897.23 (5.23%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.2 L+₹10,941.08 (5.25%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,380
Closing Date
20 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_318465_16
e-NIT No.90 REW UDHAMPUR of 2026-27 Dated 29-07-2026
Open Tender
Civil Works
Percentage
30 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹4,380
29 Aug 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: All kinds of soil | 7.95 | cum | 479.3 | ₹3,810.44 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.72 | cum | 4,826.5 | ₹8,301.58 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) i.e 70% c.conc. | 13.78 | cum | 5,733.6 | ₹79,009.01 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) i.e 30% boulder. | 3.48 | CUM | 937.9 | ₹3,263.89 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.66 | cum | 9,821.85 | ₹6,482.42 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 56.47 | kg | 123.2 | ₹6,957.1 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 3.23 | cum | 9,027.2 | ₹29,157.86 |
| 8 | 12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand) | 36.72 | SQM | 266.2 | ₹9,774.86 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | 6.37 | SQM | 562.15 | ₹3,580.9 |
| 10 | Colour washing such as green blue or buff to give an even shade New work (two or more coats) with a basecoat of white washing with lime. | 23.29 | SQM | 38.6 | ₹898.99 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1049523.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .