Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.4 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹3.5 L+₹15,328 (4.52%)Rejected-Finance 2 III 7 OBRA COLONY OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹3.6 L+₹18,236 (5.38%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder |
Tender Value
₹3.4 L
EMD Value
₹7,000
Closing Date
5 Jul 2021, 6:00 pmClosed
Superintending Engineer O and MC-II,3X200MW,BTPS
Superintending Engineer O and MC-II,3X200MW,BTPS
Preventive maintenance of small pumps and etc works for unit no. -9,10 and 11, 3X200 MW, BTPS, Obra
2021_RVUNL_588926_1
T- 2/SE-II/BTPS/TMD-I/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Unit no. 9, 10 and 11 of 3X200MW, BTPS, Obra
As per PQC
3 documents required · 3 mandatory
₹296
Dy. Chief Account Officer, CFA and BO, BTPS, Obra
₹7,000
10 Dec 2021
24 May 2021
8 Jul 2021
24 May 2021
5 Jul 2021
24 May 2021
24 May 2021 - 5 Jul 2021
Amount
Removal of chocking from the bearing cooling line of condensate pump by brush and high pressure air.
Replacement of cooling line / removal of chocking of bearing cooling of condensate pump by cutting welding at different places.
Removal of chocking of gland cooling line of drip pump by brush from header to drip pump.
Removal of mud from the cooling coil of BFP booster pump bearing by cutting and brazing.
Removal of chocking of gland cooling line of BFP Booster pump by cutting welding from header to gland box.
Removal of chocking /mud from the seal water cooler including O/H of seal water cooler of BFP.
Removal of chocking / mud from the header of BPF lub oil cooler and working oil cooler. (Main header inlet & outlet.)
Replacement of gland cooling header and branch line of BFP with proper union and square block / flange.
Installation of new phosphate dozing pump / Hydrazine pump/BCW pump / SWC pump / CW Booster pumps in 3X200MW unit.
Filling gland in condensate pump.
Filling gland in drip pump at both ends.
Cleaning of suction filter of hydrazine in phosphate pump.
Changing the plunger of hydrazine dozing pump.
Removal of mud /foreign partcle from the suction filter of air washer pumps.
Changing the plunger of phosphating dozing pump.
Transportation of spares part / consumable / oil from CSD to site store
MASSIVE CONSTRUCTION CO
M/S ADITIYA VISHWAKARMA CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .