| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.9 LAccepted-AOC KUDIYATHAM TALUK VELLORE DISTRICT | VELLORE | TAMIL NADU | 632001 | L1 | Accepted-AOC L1 value less than tender value | |
| 2 | L2₹74.2 L+₹29,464.13 (0.40%)Rejected-AOC | L2 | Rejected-AOC L2 value greater than tender value |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
19 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director
DRDA,Vellore
Vellore District MGSMT 2022 23 Strengthening of the road Ramalai krishnapuram salai moolavalasai salai Km 0/0 1/200 Package no 09
2023_RDTN_313663_1
DIPR/2018/Tender/2023
Open Tender
Civil Works
Item Rate
180 days
DRDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹75,000
21 Jun 2023
11 May 2023
19 May 2023
11 May 2023
19 May 2023
11 May 2023
Amount
STRENGTHENING THE ROAD FROM RAMLAI KRISHNAPURAM SALAI MOOLAVALASAI SALAI IN RAMALAI PANCHAYAT KM 0/0 - 1/360 (R-136)
Clearing the scrub jungles including cutting the scrub and removing away from site etc Complete
Picking 5 cm to 10 cm old metalled surface and sectioning including all Cost and Convenyance for all Cost etc Complete
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface including all cost and Convenyance for etc Complete
Construction of Retainingwall at CH 300 & CH 785
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
Cement concrete 1:3:6 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m height. For plague surfaces in all floors with all cross bracing wing mild steel of size 0.90cm x 60cm and 10 gouge stiffened welded with mild steel angles of size 25mmx 25 mmx 3mm for boarding laid over silver oak (C.wood) joined of size 10cm x 6.5cm dia spaced above 90cm center to center and supported by casuarinas propels from to 13cm dia spaced at 75cm center to center etc., complete complying with standard specification and as directed for the following items. (Below GL)
Plastering with Ceemnt Motor 1:5,20mm thick including Cost and Convenyance and all labour Charges for etc Complete
Construction of Box Culvert
Dismantling the Existing Reinforced Cement Concrete in the existing bridge and Clering away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officer including all labour and incidental Charges for etc Complete
Dismantling the Existing RR Masonry in the existing bridge and Clering away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officer including all labour and incidental Charges for etc Complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Plain Cement Concrete M-15 Grade nominal mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for LEVELLING COURSE BELOW BASE SLAB OF CULVERT (Without Centering).
Vibrated Cement Concrete M20 Grade NOMINAL MIX 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for PARAPET OVER CULVERT.
Vibrated Reinforced Cement Concrete grade M25 (Design Mix) using ISS size HBG graded metal including cost and conveyance of all materials to site, including cost and labour charges including formwork and centering, labour charges, transporting and placing in position, compacting, finishing and curing, working at depths, Tools and Plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification for BASE SLAB, SIDE WALLS AND TOP SLAB OF CULVERT
Vibrated Cement Concrete M20 Grade NOMINAL MIX 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for WING WALL (below Sill)
Vibrated Cement Concrete M20 Grade NOMINAL MIX 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for WING WALL (Above Sill)
Vibrated Cement Concrete M15 Grade NOMINAL MIX 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for PARAPET WALL
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification.
Filling under the box culvert with Stone Dust to required thick below the foundation concrete including cost and conveyance of all material to site form any approved source satisfying the standard and specifications
Provision for H.M. stone
Provision for K.M. stone
60CM Equilateral triangale Traingle Cautionary Signboard
Providing Name Board cum Citizen Board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.S CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .