Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹2.3 L
EMD Value
₹4,640
Closing Date
2 Jun 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate Division Srinagar
Executive Engineer RNb Dalgate Division Srinagar
Repair of Jetty near Ghat No.21 on Boulevard road Srinagar .
2026_PWDJK_310766_1
NIT No._15_/e-tendering /DAL/2026-27/_1792-97 Dt_22-05-2026
Open Tender
Civil Works
Percentage
20 days
Boulevard road Srinagar .
as per Nit
2 documents required · 2 mandatory
₹200
Executive Engineer RNb Dalgate Division Srinagar
₹4,640
4 Jun 2026
23 May 2026
3 Jun 2026
24 May 2026
2 Jun 2026
24 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar. | 0.9 | Cum | 1,474.96 | ₹1,327.46 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.11 | Cum | 5,585.81 | ₹614.44 |
| 3 | Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level including curing complete with:7.7.1 Cement mortar 1:6 (1 Cement : 6 coarse Sand) including all carriages stones for 15kms and sand for 20kms leads, lifts complete. (2nd sort) | 1.49 | Cum | 8,936.44 | ₹13,288.49 |
| 4 | Providing on hire/rental basis wooden scaffolding/centering system using hardwood posts/pillars with necessary planks, wedges, runners, struts, bracing and supports, properly erected in position for upholding ceiling/shuttering work, including erection, alignment, levelling, maintenance during hire period and removal after completion, with all labour, tools and consumables — complete job as directed by Engineer-in-Charge. | 24.72 | Sqm | 169.49 | ₹4,189.79 |
| 5 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 33.92 | Sqm | 11.99 | ₹406.7 |
| 6 | Providing and fixing wooden jallars (jaali work) of approved design and size, made from hardwood including, framework ,beading cutting, shaping, jointing, assembling, polishing with two or more coats of approved touchwood polish, and finishing smooth. Work to include supply of all necessary fixtures (screws, nails, brackets, adhesives), scaffolding, labour, and tools — complete job in all respects as directed by the Engineer-in-Charge. | 7.58 | Sqm | 2,966.1 | ₹22,483.04 |
| 7 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): First class deodar wood | 0.05 | Cum | 1,39,046.31 | ₹6,535.18 |
| 8 | Providing and fixing of Devri stone , finely chiseled all sides, with mouldings and ornamental work as per samples available on site; complete fixing to poles using approved chemical dhesive, including concreting , excavation , dismanling of existing work , cutting, chasing, bedding, pointing, scaffolding, tools, consumables and skilled labour — complete job in all respects as directed by Engineer-in-Charge. | 2 | Job | 30,508.47 | ₹61,016.94 |
| 9 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 334.51 | Kg | 133.01 | ₹44,493.18 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work. | 56.41 | Sqm | 111.74 | ₹6,303.25 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_1005191.xls
BOQ • 0.32 MB
Ext15jetty.pdf
PDF • 0.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .