Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-Finance | ₹29.4 L | L1 | Accepted-Finance Quoted Amount less than estimate |
| 2 | L2₹29.5 LRejected-Finance | ₹29.5 L | L2 | Rejected-Finance Quoted Amount More than estimate |
| Sl No | Description | Qty | Unit | REKHA L2 | SMART LIGHTS POWER INDUSTRIES L1 |
|---|---|---|---|---|---|
| 1.00Providing HDPE Pipe line from Cheyyar river to Mangal Sump at Mangal Panchayat | |||||
| 1.01 | Earth work excavation and depositing on bank with initial lead and initial lift in Sand soil etc., complete as per sandy soil | 2,835 | Cum | 205.8 ₹5,83,443 | 205.3 ₹5,82,025.5 Lowest |
| 1.02 | Refilling Excavated sand and all labour charges,etc, | 2,835 | Cum | 42.85 ₹1,21,479.75 Lowest | 42.85 ₹1,21,479.75 Lowest |
| 1.03 | 90mm dia HDPE Pipe PN10 | 4,500 | Rm | 379 ₹17,05,500 Lowest | 379 ₹17,05,500 Lowest |
| 1.04 | Flange | 5 | No | 112.6 ₹563 Lowest | 112.6 ₹563 Lowest |
| 1.05 | Nipple | 4 | No | 46 ₹184 Lowest | 46 ₹184 Lowest |
| 1.06 | Bolt | 5 | No | 127.9 ₹639.5 Lowest | 127.9 ₹639.5 Lowest |
| 1.07 | Labour Charges Laying HDPE Pipes | 4,500 | Rm | 18.75 ₹84,375 Lowest | 18.75 ₹84,375 Lowest |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 4,49,313 ₹4,49,313 | 4,49,058 ₹4,49,058 Lowest |
Tender Value
₹29.7 L
EMD Value
₹29,720
Closing Date
5 Mar 2026, 4:00 pmClosed
Block Development office(V.pt), Vembakkam
Block Development office, Vembakkam
Excecution of Village Panchayat Fund 2025-2026 Providing HDPE Pipeline from Cheyyar river to Mangal sump at Mangal Panchayat in Vembakkam Block
2026_RDTN_667247_1
A6/104/2026 Date.23.02.2026
Open Tender
Civil Works - Others
Item Rate
Block Development office, Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹29,720
Yes
16 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
Providing HDPE Pipe line from Cheyyar river to Mangal Sump at Mangal Panchayat
Earth work excavation and depositing on bank with initial lead and initial lift in Sand soil etc., complete as per sandy soil
Refilling Excavated sand and all labour charges,etc,
90mm dia HDPE Pipe PN10
Flange
Nipple
Labour Charges Laying HDPE Pipes
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_801571.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].