Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC PAKHRIGURI KOKRAJHAR | DHUBRI | ASSAM | 783331 | ₹49.8 L | L1 | Accepted-AOC Awarded |
| 2 | L1₹49.8 LRejected-Finance VILL SHYAMTHAIBARI PO KHUNGRING PS RUNIKHATA DIST CHIRANG PIN 783375 | CHIRANG | ASSAM | 783375 | ₹49.8 L | L1 | Rejected-Finance Refer to Financial minutes. |
| 3 | L2₹49.8 L+₹6,419.39 (0.13%)Rejected-Finance VILL SOUTH SONAPUR P O PATGAON P S SERFANGURI DIST KOKRAJHAR BTC ASSAM PIN 783346 | KOKRAJHAR | KOKRAJHAR | ASSAM | 783346 | ₹49.8 L+₹6,419.39 (0.13%) | L2 | Rejected-Finance Refer to Financial minutes. |
| 4 | L2₹49.8 L+₹6,419.39 (0.13%)Rejected-Finance VILL THAPLAJHORA P O BAIRALI P S KACHUGAON DIST KOKRAJHAR ASSAM PIN 783350 | BAIRALI | KOKRAJHAR | ASSAM | 783350 | ₹49.8 L+₹6,419.39 (0.13%) | L2 | Rejected-Finance Refer to Financial minutes. |
| 5 | L3₹49.8 L+₹7,184.84 (0.14%)Rejected-Finance C O LT MAAHANTA NARZARY W NO 5 TENGAPARA P O P S KOKRAJHAR DIST KOKRAJHAR BTC ASSAM PIN 783370 | KOKRAJHAR | KOKRAJHAR | ASSAM | 783370 | ₹49.8 L+₹7,184.84 (0.14%) | L3 | Rejected-Finance Refer to Financial minutes. |
| Sl No | Description | Qty | Unit | DHARAMSING NARZARY L3 | BISTI MUSHAHARY L2 | RUSTAM BASUMATARY L3 | MANOJ NARZARY L1 | ARJUN NARZARY L1 | Ranjalu Basumatary L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00… | |||||||||
| 1.01 | Item No.1. 2.2(i) (a) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 0.07 | Ha. | 55,808.98 ₹3,906.63 Lowest | 55,808.98 ₹3,906.63 Lowest | 55,808.98 ₹3,906.63 Lowest | 55,808.98 ₹3,906.63 Lowest | 55,808.98 ₹3,906.63 Lowest | 55,808.98 ₹3,906.63 Lowest |
| 1.02 | Item No.2. 3.20 (I) (a) & 11.1 (I) Foundation of Boulder revetment with dewatering in Ordinary soil | 737.36 | Cum | 196.35 ₹1,44,780.64 Lowest | 196.35 ₹1,44,780.64 Lowest | 196.35 ₹1,44,780.64 Lowest | 196.35 ₹1,44,780.64 Lowest | 196.35 ₹1,44,780.64 Lowest | 196.35 ₹1,44,780.64 Lowest |
| 1.03 | Item No.3. 14.2 Providing and laying of boulder apron laid in wire crates made with 4 mm G.I wire conforming to IS:280 &IS 4826 in 100 mm x 100 mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specifications Clause 1301. | 1,488.9 | Cum | 2,928.23 ₹43,59,841.65 Lowest | 2,928.23 ₹43,59,841.65 Lowest | 2,928.23 ₹43,59,841.65 Lowest | 2,928.23 ₹43,59,841.65 Lowest | 2,928.23 ₹43,59,841.65 Lowest | 2,928.23 ₹43,59,841.65 Lowest |
| 1.04 | Item No. 4. 14.1 Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification Clause 1301. | 127.62 | Cum | 1,959.69 ₹2,50,095.64 Lowest | 1,959.69 ₹2,50,095.64 Lowest | 1,959.69 ₹2,50,095.64 Lowest | 1,959.69 ₹2,50,095.64 Lowest | 1,959.69 ₹2,50,095.64 Lowest | 1,959.69 ₹2,50,095.64 Lowest |
| 1.05 | Item No. 5. 16.54 Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation. | 765.45 | Cum | 280 ₹2,14,326 | 279 ₹2,13,560.55 | 280 ₹2,14,326 | 270.61 ₹2,07,138.42 Lowest | 270.61 ₹2,07,138.42 Lowest | 279 ₹2,13,560.55 |
| 1.06 | Item No.6. R.C.C. Engraved signboard, photo evidence etc. | 1 | No. | 9,484.28 ₹9,484.28 Lowest | 9,484.28 ₹9,484.28 Lowest | 9,484.28 ₹9,484.28 Lowest | 9,487.02 ₹9,487.02 | 9,487.02 ₹9,487.02 | 9,484.28 ₹9,484.28 Lowest |
Tender Value
₹49.8 L
EMD Value
₹99,525
Closing Date
9 Feb 2026, 2:00 pmClosed
Director of Soil Conservation
O/o The DSC, Bhumi sangrakshan bhanvan, RGB Road, Guwahati -05
Erosion Protection Work at East Taikajhora Village under RIDF-XXXI
2026_SCD_50305_8
Tender/NIT/Pt-I/2025-26/7296
Open Tender
Civil Works
Item Rate
120 days
Chirang Soil Conservation Division
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹99,525
Yes
O/o The DSC, Assam
30 Jun 2026
17 Jan 2026
9 Feb 2026
20 Jan 2026
9 Feb 2026
22 Jan 2026
22 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1… | |||||
| 1.01 | Item No.1. 2.2(i) (a) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | - | Ha. | 55,808.98 | - |
| 1.02 | Item No.2. 3.20 (I) (a) & 11.1 (I) Foundation of Boulder revetment with dewatering in Ordinary soil | - | Cum | 196.35 | - |
| 1.03 | Item No.3. 14.2 Providing and laying of boulder apron laid in wire crates made with 4 mm G.I wire conforming to IS:280 &IS 4826 in 100 mm x 100 mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specifications Clause 1301. | - | Cum | 2,928.23 | - |
| 1.04 | Item No. 4. 14.1 Providing and laying boulders apron for bed protection with stone boulders of minimum size and as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and Technical specification Clause 1301. | - | Cum | 1,959.69 | - |
| 1.05 | Item No. 5. 16.54 Earthwork in filling in the guide bund by head load up to lead of 60m with approved quality all leads and lifts ramming and compacting with rammer weighing not less than 10kg and falling from height of not less than 90cm and sprinkling with water if necessary. earth is to collected after removing the 1st 20cm of top soil and should be free from grass, shrubs and other foreign matter and rate will be including payment ofland compensation. | - | Cum | 271.92 | - |
| 1.06 | Item No.6. R.C.C. Engraved signboard, photo evidence etc. | - | No. | 9,484.28 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
ChirangTaikajhoraVillage.pdf
Tender Documents • 0.97 MB
BOQ_80150.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .