Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 CrAccepted-AOC AT COLLEGE ROAD KARADAPALI GOBARA TALCHER PO SOUTH BALANDA PS COLLIERY DIST ANGULA STATE ODISHA PIN 759116 | TALCHER | ANGULA | ODISHA | 759116 | L1 | Accepted-AOC ACCEPTED BEING L1 | |
| 2 | L2₹36.2 Cr+₹5.4 Cr (17.5%)Rejected-Finance 3RD FLOOR ROOM NO 3004 A LAXMIPRIYA 752101 KHORDHA ODISHA INDIA | KHORDHA | ODISHA | 752101 | L2 | Rejected-Finance REJECTED NOT BEING L1 | |
| 3 | L3₹36.3 Cr+₹5.5 Cr (17.8%)Rejected-Finance AT KOTASAHI KAIRAPARI TANGI DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | L3 | Rejected-Finance REJECTED NOT BEING L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected by Tender Committee |
Tender Value
₹35.3 Cr
EMD Value
₹44.1 L
Closing Date
3 Jun 2023, 5:00 pmClosed
Sri Sambit Pattnaik
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438494886.9437485368. 0663-2542779.
Development works at Kochianali R and R site of Balram OCP under Hingula Area.
2023_MCL_279414_1
MCL/Samb/Civil-TC/e-Tender /23-24/03 dt.16.05.23
Open Tender
Civil Works - Others
Percentage
400 days
Balram OCP, Hingula Area MCL
As per NIT.
5 documents required · 5 mandatory
₹44.1 L
26 Jul 2023
18 May 2023
5 Jun 2023
18 May 2023
3 Jun 2023
19 May 2023
18 May 2023 - 27 May 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part I : Levelling at R & R site | |||||
| 1.01 | surface dressing of the grourd including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 2,77,864 | sqm | 17.65 | ₹49,04,299.6 |
| 1.02 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | 1,000 | each | 277.6 | ₹2,77,600 |
| 1.03 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth | 500 | each | 1,231.8 | ₹6,15,900 |
| 1.04 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth | 500 | each | 5,703.8 | ₹28,51,900 |
| 2Part II : Construction of Peripheral Boundary wall | |||||
| 2.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 473.34 | cum | 201.65 | ₹95,449.01 |
| 2.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 47.33 | cum | 902.55 | ₹42,717.69 |
| 2.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 47.33 | cum | 4,699.25 | ₹2,22,415.5 |
| 2.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 441.79 | cum | 6,210.7 | ₹27,43,825.15 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_289271.xls
BOQ Document • 7.24 MB
121153889.pdf
Tender Document • 1.31 MB
121153892.pdf
Tender Document • 0.36 MB
121153896.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .