| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 CrAccepted-AOC 7C GOVIND NAGAR MATHURA | MATHURA | ₹9.5 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 95185933.13 Only |
| 2 | L2₹9.8 Cr+₹24.0 L (2.52%)Rejected-Finance KHIZARPUR POST BADAUN DISTRICT ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹9.8 Cr+₹24.0 L (2.52%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹10.4 Cr+₹90.5 L (9.51%)Rejected-Finance SRSC TOWER CP 1 105 PART C PHASE II RADHIKA VIHAR MATHURA 281001 | MATHURA | MATHURA | UTTAR PRADESH | 281001 | ₹10.4 Cr+₹90.5 L (9.51%) | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹10.4 Cr+₹91.5 L (9.61%)Rejected-Finance | ₹10.4 Cr+₹91.5 L (9.61%) | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | L5₹11.3 Cr+₹1.8 Cr (19.2%)Rejected-Finance | ₹11.3 Cr+₹1.8 Cr (19.2%) | L5 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹15.0 Cr
EMD Value
₹29.9 L
Closing Date
12 Dec 2024, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widending and Strenghtning work of Akbarpur Shergarh road (ODR) in District Mathura Change-8.500 to 16.700
2024_CEAGR_980800_1
6005/14M-AC/2024-25 dated 16-11-2024
Open Tender
Civil Works
Item Rate
365 days
Mathura
Widending and Strenghtning
2 documents required · 2 mandatory
₹2,360
₹29.9 L
Yes
Agra
1 Mar 2025
6 Dec 2024
12 Dec 2024
6 Dec 2024
12 Dec 2024
6 Dec 2024
9 Dec 2024
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6).
Construction of embankment with approved material obtained from borrow pits all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MoRT&H clause 305 (3.16) & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. (Carted Earth)
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b). (For Road Work and Diversion)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.
Providing & applying Primer Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spreading primer at the rate of 0.70 Kg./Sqm. Using machanical means. Before Applying prime coat, the surface will be cleaned with Mechanical broom and water will also be sprinkled with water tanker to keep the surface Moist. The Prime coat will be applied 24 hrsbefore the application of bituminous course including all Taxes, Material, Labour, T&P etc required for proper completion of the work.
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with air compressor, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For DBM Surface).
Providing and laying Dense Graded Bituminous Macadam 100-120 TPH HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.00% by weight of total mix and filler, transporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 505 Complete in all respects. (5.04)
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For BC)
Providing and laying Bituminous Concrete with 100-120 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects.
Demolishing cement concrete manually including disposal of material within 50 metres lead As per S.I. No. 15.2.1
Supply & Laying of I shaped precast Interlocking tiles of 80 mm (Rubber molded Grey) (Compressive strength not less then 30Mpa and weight 4.50kg) Including 25mm thick local sand base levelling and dressing of surface to required level and slope, filling joints with local sand all complete work. As per Chapter no. 20 Sl No. 14
Construction of Drain, Hume Pipe Culvert & Retaining Wall Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. As per S.I. No. 4.1.8
RCC work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5 SI No- 5.1.2
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per S.I. No. 6.1.1
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 coarse sand) :Raised and cut pointing. As per S.I. No 13.31.2
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. As per S.I. No. 13.4.1
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. As per S.I. No. 4.1.3
Supply and laying & fixing of 350mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 600mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 1000mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification. (For Road Crossing and Diversion)
Coursed rubble masonry (first sort) with hard stone in superstructure above plinth level and upto floor five level. 1:6 (1 cement : 6 coarse sand). As per S.I. No 7.8
RCC BOX Culvert Plain/Reinforced Cement Concrete (PCC Grade M15) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8ACase-II
Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORT&H Specification no. 304 (12.03).
Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8GCase - II
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.42
Plain/Reinforced cement concrete (RCC M-30) in sub-structure complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.05
Furnishing and Placing Reinforced/ Prestressed cement concrete (RCC M-30) in super-structure as per drawing and Technical Specification. As per MORT&H Specification no. 14.1C Case II
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications, all complete as per clause 2702. As per MORT&H Specification no. 14.4
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.8
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. As per MORT&H Specification no. 13.9
Drainage Spouts complete as per drawing and Technical specification. As per MORT&H Specification no. 14.9
Demolishing R.B. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Dewaterng of water trenches during excavation, concreting, masonary works upto sub soil/ water level including hire charges of 5 H.P.
Boring with 100 dia casing pipe including lowering & extraction, assembling, loading, unloading & cartage etc (hire charges only).
Empty Cement Bags of good condition (Plastic) filled with Carted Earth including filling, stiching and stacking at side of filling. (For Diversion)
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 36)
Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 36)
Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 36)
Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 36)
Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 36)
SHREE PRADEEP KUMAR (BID ID -4781703)
Srsc Infra Private Limited (BID ID -4780189)
S R Contractor (BID ID -4782157)
National Highway Const. Co (BID ID -4782542)
M/S R P INFRAVENTURE PRIVATE LIMITED (BID ID -4780583)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
158052087.xls
BOQ Document • 0.32 MB
158052088.pdf
Tender Document • 3.29 MB
Addendum_AS.pdf
Tender Document • 2.20 MB
SBDAkabarpurShergarh.pdf
Tender Document • 1.17 MB
158052090.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .