| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹30.4 L+₹6.7 L (28.4%)Accepted-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L2 | Accepted-Finance L2 | |
| 3 | L3₹33.8 L+₹10.1 L (42.6%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Document Incomplete | |
| 5 | Rejected-Technical | - | Rejected-Technical Document Incomplete |
| Sl No | Description | Qty | Unit | CHANDRA BHAN SINGH L3 | NIRANJAN SINGH CONTRACTOR L1 | GOMATINETRA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 0.00The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | ||||||
| 1.00 | E/W Excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 982.61 | Cum | 119 ₹1,16,930.59 | 80 ₹78,608.8 Lowest | 107.56 ₹1,05,689.53 |
| 2.00 | Supplying & Laying coarse sand in Inverted filter including all cost of material, labour, T&P etc with all leads & lifts required for completion of work. | 189.66 | Cum | 1,841 ₹3,49,164.06 | 1,100 ₹2,08,626 Lowest | 1,657.35 ₹3,14,333 |
| 3.00 | Laying C.C. 1:3:6 (M10 A40) in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 74.59 | Cum | 4,237 ₹3,16,037.83 | 3,500 ₹2,61,065 Lowest | 3,814.26 ₹2,84,505.65 |
| 4.00 | RCR stone masonry 1:4 cm with all cost of laour cement, sand, stone T&P etc required for completion of work. | 242.73 | Cum | 4,823 ₹11,70,686.79 | 3,800 ₹9,22,374 Lowest | 4,341.45 ₹10,53,800.16 |
| 5.00 | Laying C.C. 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material labour T&P etc required for completion of work. But excluding GST. | 30.34 | Cum | 5,092 ₹1,54,491.28 | 3,800 ₹1,15,292 Lowest | 4,582.22 ₹1,39,024.55 |
| 6.00 | Supplying & laying filter material 20 mm gauge including cost of material, labour T&P etc with all leads & lifts for proper completion of job. | 172.61 | Cum | 2,057 ₹3,55,058.77 | 1,200 ₹2,07,132 Lowest | 1,851.17 ₹3,19,530.45 |
| 7.00 | Grouted stone pitching all cost of labour material T&P etc required for completion of work. | 1,150.7 | Sqm | 771 ₹8,87,189.7 | 480 ₹5,52,336 Lowest | 694.56 ₹7,99,230.19 |
| 8.00 | E/W in back filling with all cost of labour, material, T&P etc with proper completion of work. | 589.56 | cum | 54 ₹31,836.24 | 44 ₹25,940.64 Lowest | 48.69 ₹28,705.68 |
Tender Value
₹33.8 L
EMD Value
₹67,600
Closing Date
25 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Construction of Dry stone pitching in canal section of Surauly Dy from km 0.00 to 0.103, Silhata minor and Gusiyari minor from km 0.00 to 0.054 (Lot-02)
2026_UPIDC_1175409_2
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
Distt Hamirpur
AS PER NIT
2 documents required · 2 mandatory
₹854
₹67,600
17 Oct 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/W Excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 982.61 | Cum | 119.5 | ₹1,17,421.9 |
| 2 | Supplying & Laying coarse sand in Inverted filter including all cost of material, labour, T&P etc with all leads & lifts required for completion of work. | 189.66 | Cum | 1,841.29 | ₹3,49,219.06 |
| 3 | Laying C.C. 1:3:6 (M10 A40) in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 74.59 | Cum | 4,237.22 | ₹3,16,054.24 |
| 4 | RCR stone masonry 1:4 cm with all cost of laour cement, sand, stone T&P etc required for completion of work. | 242.73 | Cum | 4,823.3 | ₹11,70,759.61 |
| 5 | Laying C.C. 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material labour T&P etc required for completion of work. But excluding GST. | 30.34 | Cum | 5,092.82 | ₹1,54,516.16 |
| 6 | Supplying & laying filter material 20 mm gauge including cost of material, labour T&P etc with all leads & lifts for proper completion of job. | 172.61 | Cum | 2,057.05 | ₹3,55,067.4 |
| 7 | Grouted stone pitching all cost of labour material T&P etc required for completion of work. | 1,150.7 | Sqm | 771.65 | ₹8,87,937.66 |
| 8 | E/W in back filling with all cost of labour, material, T&P etc with proper completion of work. | 589.56 | cum | 54.1 | ₹31,895.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
BOQ_2208885.xls
BOQ • 0.30 MB
NIT02.pdf
Tender Documents • 3.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .