Tender Value
₹5.4 Cr
EMD Value
₹10.9 L
Closing Date
15 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
84 days
Expenditure
(PH-31)
TRD
14 conditions · 2 needing a document upload
As "Cl. No. 10.2. Financial Eligibility Criteria" of Indian Railways Standard General Conditions of Contract, GCC April 2022 and all it's Advance Correction Slips and it's latest revisions.
As "Cl. No. 10.1 Technical Eligibility Criteria" of Indian Railways Standard General Conditions of Contract, GCC April 2022 and all it's Advance Correction Slips to date and it's latest revisions.
Defination of Similar Work :- "Any Overhead Equipment (OHE) / Power Supply Installations (PSI) / Auxiliary Transformer (AT) work on 25 kV AC Railway Traction for new line electrification or addition and alteration involving supply, erection, testing and commissioning of any Railway System in India carried out on Zonal Railways / Construction / RE / RVNL works or public listed Company subject to conditions in the GCC with regard to Public listed companies vide Para 10.1 of GCC April 2022"
47 conditions · 8 needing a document upload
All the tenderers/Contractors have to deposit full tender document cost (if applicable) as stipulated for the tender, ONLY through online modes as permitted in IREPS application through multiple banks net banking, debit and credit cards.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
PAYMENT OF BID SECURITY (EMD) : The Bid Security shall be deposited either in cash through e-payment gateway or submitted as Bank Guarantee bond (BG) from a scheduled commercial bank of India or as mentioned in tender document. The BG shall be valid for a period of 90 days beyond the bid validity period. The BG for the value of Bid Security mentioned in tender document, shall be drawn in favour of "Senior Divisional Finance Manager, DRM office, Southern Railway, Tiruchchirappalli", on account of the contractor and the original Bank Guarantee should be delivered in person to "The Senior Divisional Electrical Engineer (Traction Distribution branch), DRM office, Southern Railway, Tiruchchirappalli", before closing date for submission of bids, excluding the last date of submission of bids. Scanned copy of Bank Guarantee submitted for Bid Security shall be uploaded. It is mandatory to upload the copy of BG if it is chosen to submit the Bid Security in the form of Bank Guarantee. Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non- Submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid.
PAN COPY : Copy of PAN Card shall be uploaded.
GST REGISTRATION CERTIFICATE: Copy of GST Registration Certificate shall be uploaded.
NEFT MANDATE :Bank official certified, filled-in copy of 'Electronic Fund Transfer Mandate form' (NEFT Form) containing tenderer's bank account details such as Name of the Bank, Bank Branch Code, Account Number, IFSC Code, etc., as per Appendix B of Tender Document - Part 1 shall be uploaded. ( Click here to download Format)
RATES ARE ALL INCLUSIVE : All rates quoted by the tenderer for this work tenders shall be deemed to be inclusive of all taxes, duties, royalties, octroi, cess etc. payable by the contractor to the Govt. or any public body and no additional amount / rate or claim will be entertained on this account by the Railways. Also no claim whatsoever will be accepted by Railways on account of revision of tax rates, new taxes of statutory nature by State/Central Govt, unless otherwise any specific instruction from the statutory authorities as per extant rules.
CERTIFICATE OF TRUTHFULNESS : A copy of certificate stating that all their statements / documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Appendix-A. In Addition to Appendix-A, in case of other than Company / Proprietary firm, Appendix-AA shall also be submitted by the each member of a partnership firm / Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may be. Non submission of above certificate(s) by the bidder shall result in summarily rejection of his / their bid. ( Click here to download Format)
ASSOCIATION WITH RETIRED RAILWAY EMPLOYEE : The Contractor shall abide by the instructions contained in the Clause No.16 of Annexure I of Part I and Clause No. 59(9) of Part II of Indian Railways Standard General Conditions of Contract, April 2022. In this connection, the contractor shall clearly furnish the details of employment / partnership, etc., of retired Railway employees, if any. In case of no retired railway employee associated with the firm, a statement as per the sample format at Annexure - C. ( Click here to download Format)
CONSTITUTION OF THE TENDERER'S FIRM : The tenderer shall clearly specify whether the tender is submitted on his own (proprietary firm) or on behalf of a partnership Firm / Company / Joint Venture(JV) / Registered Society / Registered Trust / HUF / LLP etc. Based on their constitution of the firm, they must submit the mandatory documents mentioned hereunder, as applicable and if same is not submitted the offer will be summarily rejected. The tenderer(s) shall enclose the attested copies of constitution of their concern, and copy of PAN card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the Firm, Company, Association, Trust or Society, as the case may be. ( Click here to download Format)
a)If the tenderer is a Sole Proprietorship Firm, they shall submit the notarized copy of an affidavit in this regard along with copy of their Pan card and they shall submit all the relevant documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC.
b)If the tenderer is a Hindu Undivided Family (HUF), they shall submit a copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF.
c)If the tenderer is a Partnership Firm, they shall submit (i) a notarized copy of the Partnership Deed or a copy of the Partnership deed registered with the Registrar, (ii) a notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm, (iii) an undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt, of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm / LLP in which they were / are partners / members. Any Concealment / wrong information in regard to above shall make the bid ineligible or the contract shall be determined under Clause 62 of the Standard General Conditions of Contract and (iv) all documents as mentioned in para 18 of the Tender Form (Second Sheet) of GCC.
d) If the tenderer is a Joint Venture (JV) - (If Applicable), they shall submit all the relevant documents as mentioned in para 17 of the Tender Form (Second Sheet) of GCC. (A tender from JV shall be considered only where permissible as per the tender conditions)
e)If the tenderer is a Company registered under Companies Act 2013, they shall submit (i) the copies of MOA (Memorandum of Association) and AOA (Articles of Association) of the company, (ii) a copy of Certificate of Incorporation and (iii) a copy of Authorization / Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company and (iv) all the other relevant documents mentioned in the Para 10 of the Tender Form (Second Sheet) of GCC.
f)If the tenderer is a LLP (Limited Liability Partnership), they shall submit (i) a copy of LLP Agreement, (ii) a copy of Certificate of Incorporation, (iii) a copy of Power of Attorney / Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP, (iv) an undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Government of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm / LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract and (v) all other relevant documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC.
g)If the tenderer is a Registered Society & Registered Trust, they shall submit (i) a copy of Certificate of Registration, (ii) a copy of Memorandum of Association of Society/Trust Deed, (iii) a copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust, (iv) a copy of Rules & Regulations of the Society and (v) all other relevant documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC.
POWER OF ATTORNEY : The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association/Board resolution, failing which tender shall be summarily rejected.
INSTRUCTIONS REGARDING LC - PART 1 :(i)For all the tenders having advertised cost of Rs. 10 lakh or above, the contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement. (ii)This option of taking payment through LC arrangement has to be exercised in IREPS (Indian Railway Electronic Procurement System - the e- application on which tenders are called by Railways) by the tenderer at the time of bidding itself, and the tenderer shall affirm having read over and agreed to the terms and conditions of the LC option. (iii)The option so exercised, shall be an integral part of the bidder's offer. (iv)The above option of taking payment through LC arrangement, once exercised by tenderer at the time of bidding, shall be final and no change shall be permitted, thereafter, during execution of contract. (v)In case tenderer opts for payment through LC, following shall be the procedure to deal release of payment through LC: (a)The LC shall be a sight LC. (b)The contractor shall select his Advising/Negotiating bank for LC. The incidental cost towards issue of LC and its operation thereof shall be borne by the contractor. (c)SBI, New Delhi, Main Branch will be the nodal branch for issue of LCs based on onlinerequests received from Railway Accounts Units for tenders opened in financial year 2018-19. SBI branches where the respective Railway Accounts Office has its Account (local SBI branch) will be the issuance/reimbursing branch for LC issued under this arrangement. The Bank shall remain same for this tender till completion of contract. The incidental cost @ 0.15 % per annum of LC value, towards issue of LC and operation thereof shall be borne by the contractor and shall be recovered from his bills. (d)The LC shall be opened initially for duration of 180 to 365 days in consultation with contractor. The LC shall be extended time to time as per the progress of the contract, on the request of the contractor. The value of LC to be opened initially as well as extended thereafter shall be finalised by the engineer in consultation with the contractor on the basis of expected progress of work. (e)The LC terms and conditions shall inter-alia indemnify and save harmless the Railway from and against all losses, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the contractor, his agents or employees, in relation to the Letter of Credit (LC). All sums payable/borne by Railways on this account shall be considered as reasonable compensation and paid by contractor.
INSTRUCTIONS REGARDING LC - PART 2 : (f)The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank. (g)The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation. (h)The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways. (i)On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j)The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill. (k)The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch). (l)The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch0. (m)The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account. (n)Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened. (o)The LC shall shall be closed after the release of final payment including PVC amount, if any, to the contractor. (p)The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC.
PAYMENT OF TENDER DOCUMENT COST : The tenderer shall deposit the Tender Document Cost (If applicable) as stipulated in the tender document, ONLY through online modes as permitted in IREPS application.
MUTUALLY BINDING : If the tenderer's offer is accepted, until the formal agreement is executed, acceptance of this tender shall constitute a binding contract between Railways and the tenderer / contractor, subject to modifications, as may be mutually agreed to between Railways and the tenderer / contractor and it will be indicated in the letter of acceptance of the tenderer / contractor's offer for this work.
ABIDANCE WITH GCC & ALL CONDITIONS : I / We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to-date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions of contract , General Instructions and conditions, explanatory notes for schedule of work and all the Annexures.
OFFER VALIDITY : I/We agree to keep this offer open for acceptance, during offer validity period as mentioned in the tender document, from the date of tender opening and in default thereof I/We will be liable for forfeiture of my/our Earnest Money. I/We offer to do the work for Railway, at the rates quoted in the attached Schedule and hereby bind myself/ourselves to complete the works in all respects.
RIGHTS OF RAILWAYS TO INCLUDE CONDITIONS :Railways shall have the right to incorporate any such condition quoted by tenderer, in the contract, at Railway's discretion, if contract is placed on the tenderer.
TENDERER TO READ ALL CONDITIONS : I/We have read the various conditions attached/ referred to in this tender document, and agree to abide by the said conditions.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Contractors are allowed TO make payments against this tender towards tender document cost AND earnest money ONLY through ONLINE payment modes available ON IREPS portal LIKE net banking, debit card, credit card etc. MANUAL payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are NOT allowed.
Before quoting the rates for schedule items, the Schedule shall be read in conjunction with its explanatory notes for detailed description of various items included therein.
Indian Railways Standard General Conditions of Contract, GCC, April 2022, including all it's correction slips, upto date is applicable for this contract.
Provision of the GST Act is effective across the country from 1st July, 2017. Hence, this contract would be subjected to GST Act & Rules as applicable from time to time.
I f the Tenderer (s) deliberately give(s) wrong information/incorrect documents in his/their tender o r create circumstances for the acceptance of his/their tender , the Railway reserves the right to reject such tender a t any stage. The entire EMD and any other dues available with Railway against that contract will be forfeited. Action w ill b e taken t o suspend the business with the tenderer for a period of one year . I n addition, Administration reserves the right to prosecute the tenderer under suitable law.
All terms and conditions in the tender documents are binding on the Tenderers.
Railways reserves t h e right t o accept o r reject any or all the tenders and to award t h e w o r k i n whole o r i n p a r t without assigning the reason for any such action.
The Tenderers are advised t o visit the site o f work i n their own interest and acquaint themselves w ith the site conditions and expected quantum o f work and assess all the site specific difficulties to be experienced while executing the same and the rate shall be arrived duly considering all the facts above and quoted in the tender. Any representation at a later date specifying the site difficulties shall not be considered.
T h e tenderer shall go through the entire tender documents thoroughly and strictly adhere the instructions and directions given at different pages.
Tender Document Cost once paid is non-refundable.
Unreleased EMD of any tenderers, i f any, held with the Railway Administration, shall not be adjusted towards the EMD to be remitted.
All the required/supporting documents should be scanned and uploaded.
TPJ Division - VM-TPJ (Chord Line) - Realignment of curves and tamping to increase the speed potential of feasible curves to 130 kmph -Phase-II- Electrical Traction Arrangements (VRI-TPJ Section)
TPJ-TRD-2026-2027-14~SR
TPJ-TRD-2026-2027-14
Open
Works - General
9 Months
Chennai, Tamil Nadu
₹0
₹10.9 L
19 Aug 2026
19 Aug 2026
1 Sept 2026
139 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,43,80,083.13 | ||
| — | 12.00 | — | — | ||
| Preparations of Designs and Drawings for overhead equipment and verification of purchasers engineering plan | — | — | — | 1,80,000 | |
| — | 1165.00 | — | — | ||
| Concrete for foundation and plinth in other than hard soil and rock | — | — | — | 1,14,17,000 | |
| — | 104.00 | — | — | ||
| Supply of traction mast and main masts of switching stations, booster stations and L.T. supply Transformer stations - By manual | — | — | — | 1,31,56,000 | |
| — | 104.00 | — | — | ||
| Erection of traction mast and main masts of switching stations, booster stations and L.T. supply Transformer stations - By manual | — | — | — | 9,36,000 | |
| — | 36.50 | — | — | ||
| Supply of fabricated steel work other than masts by manual | — | — | — | 46,72,000 | |
| — | 36.50 | — | — | ||
| Erection of fabricated steel work other than masts by manual | — | — | — | 6,04,440 | |
| — | 34.80 | — | — | ||
| Supply of fabricated steel works (SPS) | — | — | — | 42,26,112 | |
| — | 34.80 | — | — | ||
| Erection of fabricated steel works (SPS) | — | — | — | 3,13,200 | |
| — | 56.00 | — | — | ||
| Supply of Guy Rod Assembly | — | — | — | 7,16,632 | |
| — | 56.00 | — | — | ||
| Erection of Guy Rod Assembly | — | — | — | 92,736 | |
| — | 312.00 | — | — | ||
| Supply of Single Bracket Assembly | — | — | — | 78,36,192 | |
| — | 312.00 | — | — | ||
| Erection of Single Bracket Assembly | — | — | — | 7,23,340.8 | |
| — | 5.50 | — | — | ||
| Supply of Over Head Equipment (conventional) (excluding supply of copper contact wireand catenary wire) | — | — | — | 2,82,442.16 | |
| — | 5.50 | — | — | ||
| Erection of Over Head Equipment (conventional) | — | — | — | 3,93,364.4 | |
| — | 2.00 | — | — | ||
| Erection of 150 sq.mm 25Kv Cu Feeder | — | — | — | 51,798.66 | |
| — | 3.00 | — | — | ||
| Supply of materials/ termination of 25 kV terminating wire (150 sq mm) copper cross track / along track feeder | — | — | — | 25,500 | |
| — | 3.00 | — | — | ||
| Erection of materials/ termination of 25 kV terminating wire (150 sq mm) copper cross track / along track feeder | — | — | — | 9,000 | |
| — | 25.00 | — | — | ||
| Supply of regulating equipment (Mod. 3 pulley type ) with counter weight assembly for Conventional OHE | — | — | — | 18,48,280 | |
| — | 25.00 | — | — | ||
| Erection of regulating equipment (Mod. 3 pulley type ) with counter weight assembly for Conventional OHE | — | — | — | 1,31,100 | |
| — | 25.00 | — | — | ||
| Supply of materials for termination arrangements for double over head equipment conductor | — | — | — | 2,76,000 | |
| — | 25.00 | — | — | ||
| Erection of materials for termination arrangements for double over head equipment conductor | — | — | — | 23,000 | |
| — | 8.00 | — | — | ||
| Supply (excluding supply of copper conductor) of anticreep with Cadmium Copper Catenary/pure copper catenary Wire. | — | — | — | 68,816 | |
| — | 8.00 | — | — | ||
| Erection of anti-creep with Cadmium Copper Catenary/pure copper catenary Wire | — | — | — | 41,599.28 | |
| — | 1.00 | — | — | ||
| Supply of 25KV, 1250Amps single pole isolator as per RDSO specification no. ETI/OHE/16 (1/94) with operating handle assembly | — | — | — | 57,960 | |
| — | 1.00 | — | — | ||
| Erection of 25KV, 1250Amps single pole isolator as per RDSO specification no. ETI/OHE/16 (1/94) with operating handle assembly | — | — | — | 7,500 | |
| — | 10.00 | — | — | ||
| Supply of Solid copper bus bar 18 mm | — | — | — | 11,856.9 | |
| — | 10.00 | — | — | ||
| Erection of Solid copper bus bar 18 mm | — | — | — | 796.7 | |
| — | 2.00 | — | — | ||
| Supply of Al.bus bar connectors Terminal connector bolted type (1009&1009-1) | — | — | — | 2,488.54 | |
| — | 2.00 | — | — | ||
| Erection of Al.bus bar connectors Terminal connector bolted type (1009&1009-1) | — | — | — | 801.4 | |
| — | 2.00 | — | — | ||
| Supply of solid copper bus bar connectors-Bus terminal (6310) | — | — | — | 3,585.18 | |
| — | 2.00 | — | — | ||
| Erection of solid copper bus bar connectors-Bus terminal (6310) | — | — | — | 707.66 | |
| — | 2.00 | — | — | ||
| Supply of solid copper bus bar connectors-Bus splice (6320) | — | — | — | 3,688.28 | |
| — | 2.00 | — | — | ||
| Erection of solid copper bus bar connectors-Bus splice (6320) | — | — | — | 1,040.4 | |
| — | 2.00 | — | — | ||
| Supply of solid copper bus bar connectors-Bus tee joint | — | — | — | 3,482.08 | |
| — | 2.00 | — | — | ||
| Erection of solid copper bus bar connectors-Bus tee joint | — | — | — | 707.66 | |
| — | 2.00 | — | — | ||
| Supply of solid copper bus bar connectors-Bus terminating tee | — | — | — | 8,581.02 | |
| — | 2.00 | — | — | ||
| Erection of solid copper bus bar connectors-Bus terminating tee | — | — | — | 60.92 | |
| — | 1.00 | — | — | ||
| Erection of 25KVA, 25KV/240V, 50Hz single phase oil filled Auxiliary Transformer as per RDSO specification No. ETI/PSI/15 (08/2003) or latest | — | — | — | 14,076.3 | |
| — | 1.00 | — | — | ||
| Erection of 25 KV Drop out fuse assembly without base and insulator suitable for 25Kv Auxilary Transformer confirming to RDSO Specification No. ETI/PSI/14 (1/86) REV.1 (APR -87) or latest. | — | — | — | 2,866.5 | |
| — | 4.00 | — | — | ||
| Supply of single earth electrode | — | — | — | 10,396 | |
| — | 4.00 | — | — | ||
| Erection of single earth electrode | — | — | — | 3,676 | |
| — | 40.00 | — | — | ||
| Supply of earth bus | — | — | — | 5,440 | |
| — | 40.00 | — | — | ||
| Erection of earth bus | — | — | — | 2,560 | |
| — | 12.00 | — | — | ||
| Supply of 25 Kv Post Insulator | — | — | — | 80,026.92 | |
| — | 12.00 | — | — | ||
| Erection of 25 Kv Post Insulator | — | — | — | 6,411.12 | |
| — | 65.00 | — | — | ||
| Supply of 9tonne cut insulator | — | — | — | 2,54,150 | |
| — | 65.00 | — | — | ||
| Erection of 9tonne cut insulator | — | — | — | 50,830 | |
| — | 40.00 | — | — | ||
| Erection of a copper jumper | — | — | — | 25,760 | |
| — | 1200.00 | — | — | ||
| Erection of large span wire for termination of OHE | — | — | — | 3,14,496 | |
| — | 30.00 | — | — | ||
| Supply of Splicing and extension of an anchoredoverhead equipment (Supply only) | — | — | — | 77,280 | |
| — | 30.00 | — | — | ||
| Splicing and extension of an anchored overheadequipment (Erection) | — | — | — | 1,65,600 | |
| — | 135.00 | — | — | ||
| Tranfer of equipment from one mast or support to other | — | — | — | 2,29,500 | |
| — | 10.00 | — | — | ||
| Suply of Galvanized MS FLAT 40X6 MM CONFIRMING TOIS: 2062, GRADE DESIGNATION E-250 (SEMIKILLED/KILLED) FOR MATERIAL, IS: 1730 FOR DIMENSION & IS:1852 FOR QUANTITY TOLERANCE..LENGTH NOT LESSTHAN 6M AND GALVANIZATION SHALL BE DONE AS PERRDSO SPECIFICATION No. ETI/OHE/13(4/8)WITH ACS 1to 4 (The weight of the Zinc coating to be adopted is 750g/m2). | — | — | — | 8,96,800 | |
| — | 215.00 | — | — | ||
| Erection of Structure bond | — | — | — | 1,29,215 | |
| — | 110.00 | — | — | ||
| Erection of Longitudinal bond | — | — | — | 71,500 | |
| — | 110.00 | — | — | ||
| Erection of Transverse/Special bond | — | — | — | 71,500 | |
| — | 80.00 | — | — | ||
| Dismantlement of cantilever assembly | — | — | — | 75,520 | |
| — | 14.00 | — | — | ||
| Dismantling of Regulating Equipment | — | — | — | 47,600 | |
| — | 3.50 | — | — | ||
| Dismantling of Overhead Equipment | — | — | — | 77,000 | |
| — | 24.00 | — | — | ||
| Dismantling of Guy Rod Assembly | — | — | — | 1,32,000 | |
| — | 0.50 | — | — | ||
| Dismantling of feeder / return/earth conductor | — | — | — | 7,423.35 | |
| — | 5.00 | — | — | ||
| Modification to erected equipment- Dismantling of apedestal /pininsulators | — | — | — | 1,780.9 | |
| — | 150.00 | — | — | ||
| Hiring of stone demolition machine using tractorcompressor breaker for breaking hard concretefoundation /Rocks & Stones | — | — | — | 1,50,000 | |
| — | 200.00 | — | — | ||
| Dismantlement of OHE mast / structure by cutting | — | — | — | 9,00,000 | |
| Each | 155.00 | Span | — | ||
| Dismantlement of OHE mast / structure by cutting | — | — | — | 6,97,500 | |
| — | 225.00 | — | — | ||
| Stenciling / painting of Mast number, OHE parameters(Conductor Height, Stagger & Implantation), Phoneindication (Near by Emcy. Socket Loc.) and Rail levelIndication on Mast. | — | — | — | 50,625 | |
| — | 180.00 | — | — | ||
| Supply and Erection of number plate | — | — | — | 52,740 | |
| — | 4.00 | — | — | ||
| Releasing of Portal Boom under power block/ non powerblock | — | — | — | 80,000 | |
| — | 14000.00 | — | — | ||
| Transporting of OHE structures/ Mast /Materials/equipment to the workspots | — | — | — | 15,68,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
2_Tender_Document_General_Instructions.pdf
ATTACHMENT
GCC_Works_April_2022_with_ACS_1_to_ACS_11.pdf GCC_Works_April_2022_with_ACS_1_to_ACS_11
ATTACHMENT
TechnicalTenderDocument_1.pdf
ATTACHMENT
GCC_Works_April_2022_with_ACS_1_to_ACS_11.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].