Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical BALUACHARA KALIACHAK MALDA | MALDA | MALDA | WEST BENGAL | 732206 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 31 BABULBONA ROAD P O P S BERHAMPORE DIST MURSHIDABAD | KOLKATA | WEST BENGAL | 700023 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 15 RASHBEHARI AVENUE KALIGHAT KOLKATA 700026 | KOLKATA | KOLKATA | WEST BENGAL | 700026 | Admitted-Fee/PreQual/Technical |
Tender Value
₹62.2 L
EMD Value
₹1.2 L
Closing Date
1 Oct 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Shilpa Bhavan, 31, Black Burn Lane, Kolkata- 700012
Balance Civil work of CFC Building at Malda Silk Park, Dist.- Malda
2026_MSMET_1042145_1
NIEQ 8 of 2026-27
Open Tender
CIVIL WORKS
Percentage
90 days
Malda Silk Park
As per NIET
3 documents required · 3 mandatory
₹2,360
₹1.2 L
5 Oct 2026
14 Sept 2026
5 Oct 2026
15 Sept 2026
1 Oct 2026
15 Sept 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 375 | Sqm. | 66.55 | ₹24,956.25 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 20 | Cum. | 2,508.91 | ₹50,178.2 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (including equivalent design mix | 15 | Cum. | 2,964.43 | ₹44,466.45 |
| 4 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 175 | Cum. | 321.44 | ₹56,252 |
| 5 | 20 mm cement plaster of mix : 1:6 (1 cement : 6 coarse sand) | 460 | Sqm. | 567.56 | ₹2,61,077.6 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 13.99.1 One or more coats on old work | 290 | Sqm. | 125.19 | ₹36,305.1 |
| 7 | Two track two panels sliding window with Aluminium channel for roller track, wool pile, nylon rollers with SS 304 body.9.147.A1.1 Using R2 series with frame (40 mm & above) x (40 mm & above) & sash (25 mm & above) x (50 mm & above) with zinc alloy (zamak) powder coated touch locks with hook (Height upto 1.2 metre). | 160 | Sqm. | 10,106.34 | ₹16,17,014.4 |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.11.3.1 40 mm thick with 20 mm nominal size stone aggregate | 4,240 | Sqm. | 747.97 | ₹31,71,392.8 |
| 9 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 70 | Cum. | 9,594.44 | ₹6,71,610.8 |
| 10 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: 2.1.1 All kinds of soil | 65 | Sqm. | 158.13 | ₹10,278.45 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
Tendernotice_2.pdf
PDF • 1.02 MB
BOQ_2558147.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .