Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
18 Jul 2026, 5:00 pm
Circle Officer
RURAL WORKS CIRCLE, SUNDARGARH
Construction of New Higher Secondary School building at Mahatma Gandhi Govt. High School Kadamdihi under lakhnapur Block in the district of Jharsuguda for the year 2025-26
2026_CERWI_134038_1
RWCCESNG-13 of 2026-27
National Competitive Bid
Civil Works - Buildings
365 days
Jharsuguda
3 documents required · 3 mandatory
₹10,000
₹1.4 L
Yes
1 Jul 2026
1 Jul 2026
20 Jul 2026
1 Jul 2026
18 Jul 2026
1 Jul 2026
1 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil within initial lead and lift including rough dressing and breaking clods etc. complete. including dressing and levelling the bed not exceeding 1.50m depth and Depositing the Soil within initial lead of 50m & as per specification approved by the Department. | 350.6 | cum | 282.9 | ₹99,184.74 |
| 2 | Providing filling foundation and plinth with sand well watered and rammed with all leads and lifts including cost , conveyance, royality of materials labour . T & P etc. complete as per direction of Er. In Charge. | 292.18 | cum | 971.65 | ₹2,83,896.7 |
| 3 | Cement concrete (1:3:6) with 4cm size hard granite metal of approved quality and approved quarry in foundation including hoisting laying concrete with cost conveyance of materials including watering, curing, royality all T & P required for the work etc. complete as per direction of the Er. in charge. | 106.2 | cum | 6,796.15 | ₹7,21,751.13 |
| 4 | Cement concrete of proportion (1:2:4) with 12mm (1/2") size hard granite crusher broken chips including watering curing, cost, conveyance, royalties and all taxes of all materials labour with T&P required for the work etc.complete as per direction of Engineer-in-charge. | 17.97 | cum | 8,380.1 | ₹1,50,590.4 |
| 5 | Fly ash.Brick masonary in cement mortar ( 1:6 )using K.B.Bricks of size 10"x5"x3" having crushing strength between 100 Kg/Cm2 to 149 Kg/Cm2 after immersing the bricks for six hours in water before use in foundation plinth & basement and for ornamental flower beds plinth moulding and similar such type of works with all necessary projections flooring moulding corbelling, champhering watering and curing etc.including cost,conveyance,royalties and all taxes of all materials and cost of all labouir with T&P required for the work etc.complete in all respect as per direction of Engineer-in-charge. | 88.82 | cum | 5,893.4 | ₹5,23,451.79 |
| 6 | Fly ash.Brick masonary in cement mortar ( 1:6 )using K.B.Bricks of size 10"x5"x3" having crushing strength between 100 Kg/Cm2 to 149 Kg/Cm2 after immersing the bricks for six hours in water before use in superstructure with all necessary projections flooring moulding corbelling, champhering watering and curing etc.including cost,conveyance,royalties and all taxes of all materials and cost of all labouir with T&P required for the work etc.complete in all respect as per direction of Engineer-in-charge. | 0.01 | cum | 0.01 | ₹0 |
| 7 | Ground floor | 122.94 | cum | 5,926.75 | ₹7,28,634.65 |
| 8 | First Floor | 39.61 | cum | 6,312.7 | ₹2,50,046.05 |
| 9 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. | 0.01 | cum | 0.01 | ₹0 |
| 10 | A ) Foundation,Column Base | 73.59 | cum | 8,215.45 | ₹6,04,574.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 3.92 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_599173.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid