| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 CrAccepted-AOC | ₹8.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.0 Cr+₹36.6 L (4.22%)Rejected-AOC BHUCHO | JAJAPUR | ODISHA | 755007 | ₹9.0 Cr+₹36.6 L (4.22%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.1 Cr+₹39.6 L (4.56%)Rejected-AOC H NO 66 SECTOR 27A CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | 160019 | ₹9.1 Cr+₹39.6 L (4.56%) | L3 | Rejected-AOC L3 |
| 4 | L4₹9.2 Cr+₹53.5 L (6.17%)Rejected-AOC | ₹9.2 Cr+₹53.5 L (6.17%) | L4 | Rejected-AOC L4 |
| 5 | L5₹10.3 Cr+₹1.7 Cr (19.1%)Rejected-AOC GURDASPUR CITY | ₹10.3 Cr+₹1.7 Cr (19.1%) | L5 | Rejected-AOC L5 |
Tender Value
₹10.1 Cr
EMD Value
₹20.3 L
Closing Date
9 Nov 2022, 11:30 amClosed
Executive Engineer
Executive Engineer Drainage Diviison Patiala Nabha Road Patiala
Laying 1 No Pipe Line of 1200 MM I D NP 3 RCC Pipe from RD 44200 to 52156 Effective Length 7956 Ft or 2426 Mtr
2022_WR_89368_4
1/11AT
Open Tender
Civil Works - Others
Item Rate
160 days
Executive Engineer
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
₹20.3 L
Executive Engineer Drainage Diviison Patiala
29 Nov 2022
2 Sept 2022
9 Nov 2022
2 Sept 2022
9 Nov 2022
2 Sept 2022
14 Sept 2022
Amount
CLEARANCE OF SLUSH FROM WET DRAINS BY MECHANICAL MEANS
DISPOSAL OF SLUSH USING HYRAULIC EXCAVATOR AND HYDRAULIC TRACTOR TROLLY I/C CUTTING AND LOADING IN TROLLY AND TRANSPORTING TO THE DUMP SITE WITH ALL LIFTS AND 0.55 KM LEAD (PUCCA)
PROVIDING AND LAYING PRECAST CEMENT CONCRETE BLOCK GRADE M-15(1:2:4 ) WITH SHINGLE MIXING BY MECHANICAL MEANS USING CONCRETE MIXER VOLUMETRIC TYPE AND NEEDLE VIBRATOR UNDER THE RCC PIPE INCLUDING SUPPLY, CARRIAGE, LOADING AND UNLOADING OF MATERIAL FROM AN APPROVED QUARRY COMPLETE AS PER DRAWING AND TECHNICAL SPECIFICATIONS
PROVIDING, LOWERING IN TRENCHES TO CORRECT GRADIENT AND ALIGNMENTS, JOINTING WITH TYTONE RUBBER JOINT AND CUTTING OF NP-3 1200 MM I/D RCC S/S PIPES HAVING INSIDE HDPE. LINING ISI MARKED AS PER ISI CODE IS:458-2003 INTO TRENCHES FOR ALL DEPTHS AND LAYING OUT THE SAME TO CORRECT ALIGNMENT, GRADIENTS, LEVELS ETC., CUTTING OF CONCRETE BEDS AND JOINTS HOLES, SUPPORTING THE PIPES AND SPECIALS IN CORRECT POSITION IN A SUITABLE RIGID MANNER WHILE THE SAME ARE BEING JOINTED AND UNTIL THE SURROUNDING BENCHINGS, HAUNCHES AND ENVELOPES ARE COMPLETED. THE PIPES SHALL REST ON THE BEDS AT ALL JOINTS THROUGH THEIR LENGTHS AND TO ENSURE THIS, TESTING THE PIPES FOR LEAKAGE AND MAKING GOOD THE SAME LEAKAGE AND ALL DEFECTS TO THE ENTIRE SATISFACTION OF THE ENGINEER-IN-CHARGE INCLUDING ALL CARTAGE ETC COMPLETE IN ALL RESPECTS. (Single Pipe 1200 MM)
EXTRA FOR PROVIDING 1:2 CEMENT SAND MORTAR ON TYRONE RUBBER JOINT OF RCC PIPES HAVING SOCKETS EXTENDED OUT OF BARREL, IN TRENCHES INCLUDING FACING TROWELLING AND FINISHING THE JOINTS AT THE ANGLE OF 45 DEGREE WITH FACES OF SOCKET KEEPING JOINTS WET TILL CURED, TESTING THE PIPE JOINTS FOR LEAKPROOF AND MAKING GOOD ALL LEAKAGE AND DEFECTS AS PER SPECIFICATIONS.
CONSTRUCTION BRICK MASONRY MAN HOLES IN CEMENT SAND MOTOR 1:5 WITH R.C.C 1:2:4 MIX & FOUNDATION CONCRETE 1:4:8 MIX, INSIDE PLASTERING 12 MM THICK WITH CS MORTAR 1:3, FINISHING WITH FLOATING COAT OF NEAT CEMENT & MAKING BENCHING IN CEMENT CONCRETE 1:2:4 I/C ORANGE COLORED PVC STEPS INCLUDING RCC COVER WITH FRAME 455 X 610 MM COMPLETE IN ALL RESPECT
EXCAVATION IN SOIL( ANY TYPE) USING HYDRAULIC EXCAVATOR CK 90 WITH HYDRAULIC EXCAVATOR OF 0.9 CUM BUCKET CAPACITY I/C CUTTING, TRIMMING BOTTOM AND SIDE SLOPES IN ACCORDANCE WITH REQUIREMENT OF LINES, GRADES AND X-SECTIONS, I/C ALL LIFTS AND COMBINED LEAD UPTO 30 MTR.
Refilling of soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity i/c cutting, trimming bottom and side slopes in accordance with requirement of lines, grades and x-sections, i/c all lifts and combined lead upto 30 mtr
CARRIAGE OF SLIT/earth USING HYDRAULIC EXCAVATOR AND HYDRAULIC TRACTOR TROLLY I/C CUTTING AND LOADING IN TROLLY AND TRANSPORTING TO THE EMBANKMENT LOCATIONS WITH ALL LIFTS AND LEAD OF 1.1 KM LEAD (PUCCA)
CARRIAGE OF LOCALddry slush/ silt USING HYDRAULIC EXCAVATOR AND HYDRAULIC TRACTOR TROLLY I/C CUTTING AND LOADING IN TROLLY AND TRANSPORTING TO THE EMBANKMENT LOCATIONS WITH ALL LIFTS AND LEAD OF 3.94 KM LEAD (PUCCA)
COMPACTION OF EARTH/FLY ASH AS PER SPECIFICATIONS IN 20 CM WITH LAYERS AND DRESSING INCLUDING WATERING AND ROLLING COMPLETE IN ALL RESPECT.
PROVIDING AND LAYING PLAIN CEMENT CONCRETE 1:4:8 WITH CRUSHED STONE AGGREGATE 40 MM NOMINAL SIZE MIXING BY MECHANICAL MEANS USING CONCRETE MIXER VOLUMETRIC TYPE INCLUDING SUPPLY, CARRIAGE, LOADING AND UNLOADING OF MATERIAL FROM AN APPROVED QUARRY COMPLETE IN ALL RESPECT.
STEEL WORK FIXED INDEPENDENTLY WITHOUT CONNECTING PLATES INCLUDING CUTTING, HOISTING AND FIXING IN POSITION.
PROVIDING AND LAYING 60 MM THICK FACTORY MADE CEMENT CONCRETE INTERLOCKING PAVING BLOCKS OF M-40 GRADE MANUFACTURED BY BLOCK MAKING MACHINE EQUIPPED WITH STEEL MOULD CLAMPED TO A STRONG VIBRATORY TABLE WITH HYDRAULIC PRESSURE FOR COMPACTION OF CONCRETE AS PER IRC SP 63 -2014 AND OF APPROVED SIZE AND DESIGN / SHAPE LAID IN ORDINARY GREY COLOUR AND PATTERN OVER AND INCLUDING 40 MM THICK COMPACTED BED OF COARSE SAND, FILLING THE JOINTS WITH FINE SAND ETC, ALL COMPLETE AS PER DIRECTIONS OF ENGINEER-IN-CHARGE.
PROVIDING AND FIXING 5 FT IRON MESH FENCING ON ANGLE IRON INCLUDING SUPPLY AND CARRIAGE LOADING AND UNLOADING MATERIALS COMPLETE IN ALL RESPECTS
DISMANTLING OF BRICK WORK IN CEMENT SAND MORTAR / LIME MORTAR INCLUDING T&P SCAFFOLDING WHEREVER NECESSARY, SORTING THE DISMANTLED MATERIAL, DISPOSAL OF UNSERVICEABLE MATERIAL. & STAKING THE SERVICEABLE MATERIAL WITH ALL LIFTS & LEAD OF 100 METRE (BY MECHANICAL MEANS) (L.S)
MAKING DEWATERING ARRANGEMENT BY PUMPING SET 4'' *4'' (TRACTOR DRIVEN) COMPLETE IN ALL RESPECT.
PROVIDING AND FIXING OF TRASH RACK AT INTAKE POINT AND OFF TAKE POINT. (MARKET RATE)
PROVIDING, LAYING, FIXING & JOINTING OF 200MM O/D PVC PIPE OF 8 KGF. / SQCM PIPES (FOR DEWATERING AND ROAD GULLY CHAMBERS) AS PER ISI-4985 (ISI MARKED WITH THE PRIOR APPROVAL OF ENGINEER-IN-CHARGE) ALONG THE TRENCHES AND LAYING THE SAME IN TRENCHES TO CORRECT ALIGNMENT AND GRADIENTS, CUTTING, JOINTING AND TESTING COMPLETE AS PER SPECIFICATIONS.
DISMANTLING OF PRE-STRESSED / RCC INCLUDING T&P SCAFFOLDING WHEREVER NECESSARY, SORTING THE DISMANTLED MATERIAL, DISPOSAL OF UNSERVICEABLE MATERIAL. & STAKING THE SERVICEABLE MATERIAL WITH ALL LIFTS & LEAD OF 100 MTR (BY MECHANICAL MEANS)
Constructing brick masonry road gully chambers as per standard drawings (as per sizes given below) including dressing of beds and sides of chambers to exact profiles, 15cm thick C.C 1:6:12 in foundation, first class brick work laid in cement sand mortar 1:5, 40mm thick cement concrete 1:2:4 topping inside the chamber with a floating coat of 1.5mm thick neat cement laid in one operation to the topping, the entire inner surface of the chamber rendered with neat cement not less than 12.50mm in thickness of 1:2 cement sand plaster and finished with a floating coat of neat cement 1mm thick left absolutely smooth polished and correct to template including cost of precasted RCC road gully grating and frame including paint with coal tar (as specified in item No. 29.49) complete and to the requirement of the Engineer in Charge.
a) Single road gully chamber of size 610 mm x 457mm x 800mm
CONSTRUCTING BRICK MASONRY SINGLE ROAD GULLY CHAMBERS OF SIZE 610MM X 457MM X 800MM AS PER STANDARD DRAWINGS (AS PER SIZES GIVEN BELOW) INCLUDING DRESSING OF BEDS AND SIDES OF CHAMBERS TO EXACT PROFILES, 15CM THICK C.C 1:6:12 IN FOUNDATION, FIRST CLASS BRICK WORK LAID IN CEMENT SAND MORTAR 1:5, 40MM THICK CEMENT CONCRETE 1:2:4 TOPPING INSIDE THE CHAMBER WITH A FLOATING COAT OF 1.5MM,40 MM THICK CEMENT CONCERETE LAID IN ONE OPERATION TO THE TOPPING, THE ENTIRE INNER SURFACE OF THE CHAMBER RENDERED WITH NEAT CEMENT NOT LESS THAN 12.50MM IN THICKNESS OF 1:2 CEMENT SAND PLASTER AND FINISHED WITH A FLOATING COAT OF NEAT CEMENT 1MM THICK LEFT ABSOLUTELY SMOOTH POLISHED AND CORRECT TO TEMPLATE INCLUDING COST OF PRECASTED RCC ROAD GULLY GRATING AND FRAME INCLUDING PAINT WITH COAL TAR (AS SPECIFIED IN ITEM NO. 29.49) COMPLETE AND TO THE REQUIREMENT OF THE ENGINEER IN CHARGE.
COLD TWISTED DETORMED (RIBBED/ TOR STEEL) BARS (FE 500 GRADE AS PER IS 1786-2008) , FOR R.C.C WORKS, WHERE NOT INCLUDING IN THE COMPLETE RATE OF RCC INCLUDING BENDING AND BINDING PLACING IN POSITION COMPLETE
FURNISHING AND PLACING REINFORCED CEMENT CONCRETE GRADE M 30-FOR SOLID SLAB HEIGHT UPTO 5M IN SUPERSTRUCTURE USING CONCRETE MIXER INCLUDING CENTERING AND SHUTTERING INCLUDING SUPPLY, CARRIAGE, LOADING AND UNLOADING OF MATERIAL FROM AN APPROVED QUARRY COMPLETE AS PER DRAWING AND TECHNICAL SPECIFICATIONS.
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810
PROVIDING AND LAYING 12.5 mm thick cement plaster 1:4 I/C S/O AND C/O MATERIAL FROM APPROVED QUARRY COMPLETE IN ALL RESPECT
PROVIDING AND LAYING FIRST CLASS BURNT BRICK WORK LAID IN CEMENT SAND MORTAR 1:4 IN FOUNDATION AND PLINTH INCLUDING SUPPLY, CARRIAGE, LOADING AND UNLOADING OF MATERIAL FROM AN APPROVED QUARRY COMPLETE AS PER DRAWING AND TECHNICAL SPECIFICATIONS
Applying priming coat with metal primer on new steel or iron work including preparation of surface.
Painting two or more coats excluding priming coat with ready mixed paint for metallic surfaces in all shades on steel or iron work
Shuttering for faces of concrete foundations and foundation beams & plinth beam ( vertical or battering)
PROVIDING , LOWERING IN TRENCHES TO CORRECT GRAIDIENT AND ALIGMENT , JOINTING WITH TYTONE RUBBER JOINT AND CUTTING OF REINFORCED CEMENT SPIGOT AND SOCKETD PIPES AND SPECIAL WITH RUBBER RING ISI MARKED AS PER IS CODE IS 458 : 2003 INTO TENCHES FOR ALL DEPTH AND LAYING OUT THE SAME TO CORRECT ALIGMENT , GRADIENT , LEVELS ETC CUTTING CONCRETE BED AND JOINT HOLES SUPPORYTING THE PIPE AND SPECIAL IN CORRECT POSTIONIN SUITABLE RIGID MANNER WHILE SAME ARE BEING JOINTING UNTIL THE SURROUNDING BENCHES AND HAUNCHES ENEVELOPS ARE COMPLETED PIPES SHALL REST ON BED TO ALL JOINTS THROUGH THEIR LENGTHS AND FIXING OF RUBBER RING, FACING ,TESTING THE PIPES FOR LEAKAGE AND MAKING GOOD THE SAME LEAKAGE AND ALL DEFECTS TO THE ENTIRE SATISFACTION OF THE ENGINEER IN CHARGE INCLUDING ALL CARTAGE ETC. RCC NP2 600MM I/D =100 MTR
RAJINDER SINGH CONTRACTOR
RAJINDER INFRASTRUCTURE PVT LTD
Oriental Ceramics and Refractories Pvt Ltd
M/s. shivji Singla and Sons, SIRSA
JAI BHUSHAN MALIK
MS GARGA ASSOCIATES
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_189988.xls
BOQ Document • 0.30 MB
104502343.pdf
Tender Document • 2.64 MB
104502345.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .