| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43,475Accepted-Finance | ₹43,475 | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹46,600+₹3,125 (7.19%)Rejected-Finance | ₹46,600+₹3,125 (7.19%) | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹49,225+₹5,750 (13.2%)Rejected-Finance | ₹49,225+₹5,750 (13.2%) | L3 | Rejected-Finance 3rd Lowest Bidder |
Tender Value
₹54,600
EMD Value
₹1,000
Closing Date
27 Feb 2024, 11:00 amClosed
Executive Engineer
Office Of the Executive Engineer, Electricity 400 KV Sub Station Division, Gorakhpur.
WORK OF REPLACEMENT OF 01 NO. RELAY PANEL AT 220 KV SUB STATION MOTIRAM ADDA, GORAKHPUR UNDER ELECTRICITY 400 KV SUB-STATION DIVISION, GORAKHPUR.
2024_UPTCL_888563_1
E-Tender No.-06/E400KV S/S D(G)/2023-24
Open Tender
Electrical Works
Item Rate
45 days
220 KV Sub Station Motiram Adda
Please refer Tender Documents.
2 documents required · 2 mandatory
₹590
Executive Engineer, E400KV S/S Division, Gorakhpur
₹1,000
27 Feb 2024
1 Feb 2024
27 Feb 2024
1 Feb 2024
27 Feb 2024
1 Feb 2024
Amount
Dismantalling of old Relay Panel (ABB make) installed in control room by opening of cable connections, earthing flats, nuts, bolts etc. including safe disconnection of TBC scheme and cable loop panel to panel cables connection etc. & making of new loop connection (temporary) for other helthyness of running control panels as required. The work also includes indentification of the control cables by providing suitable ferrules etc. for later use and safe shifting of the panels from control room to Store place/site store at Sub-Station.
Installation of new Relay Panel (Nelumbo make) in control room after shifting from storage place, its grouting & earthing and termination of control cables in control and relay panel as per cable schedule including providing & fixing of cable gland of appropriate sizes and ferrules etc. with all other associated works as per technical specification including safe reconnection of TBC scheme and panel to panel cables connection etc. The work also includes control cables connections as required between control panels for looping. The commissioning of the Relay Panel shall be done jointly with T&C wing including troubleshooting as needed/necessary. Also inter connection diagram as per new Relay Panel shall be submitted and got approved by the concerned supervising engineer/incharge before start of work. After completion of work schedule shall be provided as executed mentioning Cable Tag, TB No. & ferrules for Relay Panel on A4 size 100 gsm with clear print.
Laying of following size PVC copper control cable in place of running jointing cable between Relay Panel to Circuit Breaker & CT Junction Box in switchyard as per drawing with proper tagging, ferruling and dressing, binding with clamp/cable tie on cable rack in tunnel and trench. The cable shall be passing through cable hall cable rack & tunnels rack and trench. The work also include opening of trench covers and re-fixing them from trench after completion of work satisfactorily.
10 core X 2.5 Sq.mm
4 core X 2.5 Sq.mm
Dismatling and removing of following size old & unused/damaged/ defective/burst etc. control cable from different cable rack in tunnel & trench. The work includes opening of its binding, collecting, shifting to site storage place along with opening of trench cover and re-covering after completion of work satisfactorily.
10 core X 2.5 Sq.mm
4 core X 2.5 Sq.mm
MODI POWER CONSTRUCTION
M/s Radha Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .