Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹70,732.15 (0.61%)Admitted-Finance | ₹1.2 Cr+₹70,732.15 (0.61%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹5.5 L (4.75%)Admitted-Finance | ₹1.2 Cr+₹5.5 L (4.75%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GM ENTERPRISES L1 | M/S.HBM ENTERPRISE L2 | M/S. MM Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE ‘A’ PART - I (Construction of Helipad) | ||||||
| 1.01 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil. | 2,625 | Sqm | 5,64,375 ₹5,64,375 Lowest | 5,67,000 ₹5,67,000 | 5,90,625 ₹5,90,625 |
| 1.02 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 m. | 2,625 | Sqm | 9,05,625 ₹9,05,625 Lowest | 9,18,750 ₹9,18,750 | 9,97,500 ₹9,97,500 |
| 1.03 | Supplying and stacking at site of 63 mm to 45 mm size stone aggregate 225mm Compacted thickness. | 590.63 | Cum | 20,67,205 ₹20,67,205 Lowest | 20,96,736.5 ₹20,96,736.5 | 22,44,394 ₹22,44,394 |
| 1.04 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density 225 mm compacted thickness. | 590.63 | Cum | 9,98,164.7 ₹9,98,164.7 Lowest | 10,01,117.85 ₹10,01,117.85 | 10,33,602.5 ₹10,33,602.5 |
| 1.05 | Providing and laying in position cement concrete of 1:5:10 (1 cement : 5 fine sand derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources), excluding the cost of centering and shuttering - All work up to plinth level 100mm thick. | 262.5 | Cum | 27,69,375 ₹27,69,375 Lowest | 27,72,000 ₹27,72,000 | 28,87,500 ₹28,87,500 |
| 1.06 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources), excluding the cost of centering and shuttering - All work up to plinth level 100 mm thick. | 262.5 | Cum | 38,32,500 ₹38,32,500 Lowest | 38,45,625 ₹38,45,625 | 39,11,250 ₹39,11,250 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. | 33 | Sqm | 18,480 ₹18,480 Lowest | 18,810 ₹18,810 | 19,800 ₹19,800 |
| 1.08 | Providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge, Using grade 'A' sealing compound conforming to IS: 1834. | 2,460 | Rm | 1,18,080 ₹1,18,080 Lowest | 1,23,000 ₹1,23,000 | 1,35,300 ₹1,35,300 |
| 1.09 | Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete on New work (Two or more coats). | 13 | Sqm | 3,900 ₹3,900 Lowest | 4,030 ₹4,030 | 4,160 ₹4,160 |
Tender Value
₹1,500
EMD Value
₹1.8 L
Closing Date
15 Sept 2025, 5:00 pmClosed
SO-1 (Wks), HQ DGAR
Engr Br, HQ DGAR Laitkor, Shillong
Construction of Helipad with PCC Top at COB Heningkunglwa of 25 Assam Rifles
2025_ARMHA_875102_1
VIII.11014/9169/6 Sect/Helipad/Engr/2025
Open Tender
Civil Works
Works
120 days
Heningkunglwa
Please refer tender documens
2 documents required · 2 mandatory
₹1,500
HQ DGAR
₹1.8 L
Yes
10 Oct 2025
28 Aug 2025
17 Sept 2025
28 Aug 2025
15 Sept 2025
28 Aug 2025
28 Aug 2025 - 15 Sept 2025
SCHEDULE ‘A’ PART - I (Construction of Helipad)
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 m.
Supplying and stacking at site of 63 mm to 45 mm size stone aggregate 225mm Compacted thickness.
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density 225 mm compacted thickness.
Providing and laying in position cement concrete of 1:5:10 (1 cement : 5 fine sand derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources), excluding the cost of centering and shuttering - All work up to plinth level 100mm thick.
Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources), excluding the cost of centering and shuttering - All work up to plinth level 100 mm thick.
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns.
Providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge, Using grade 'A' sealing compound conforming to IS: 1834.
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete on New work (Two or more coats).
SCHEDULE ‘A’ PART - II (Construction of Drain)
Excavation work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m in all kinds of soil.
Supplying and stacking at site of 63 mm to 45 mm size stone aggregate.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering, all work up to plinth 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) in walls (any thickness) including attached pilasters, columns, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns.
M/S.HBM ENTERPRISE (BID ID -3282458)
M/S. MM Enterprises (BID ID -3282643)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .