Tender Value
₹5.0 Cr
EMD Value
₹10.1 L
Closing Date
1 Jul 2026, 11:00 am
Hubballi Division: GDG-HG (Gadag Hotagi)section : Construction of Limited Height Subway in lieu of LC NO. 112 KM 247/1-2 in between IDR-LHN (Indi Road- Lachhyan) station respectively.(Maintenence Period-12 Months)
09UBL26-27DT010626ITEM07
09UBL26-27DT010626ITEM07
Open
8 Months
Gadag, Karnataka
₹0
₹10.1 L
3 Jun 2026
3 Jun 2026
17 Jun 2026
Item Breakup - A-SCH-A
cum Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
295.00 III) : 3 graded stone aggregate 20 mm nominal size) HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
727.00 batched, machine mixed and machine v i b r a t e d Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine v i b r a t e d Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
87.00 & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
113.00 machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in- Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in c h a r g e . N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. Centering and shuttering including strutting, propping etc. and removal of form for :
2063.00 abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level Painting of cleaned plate/composite bridge girders including all scaffolding along with provision of Jhoola / hanging scaffolding ladders etc. where required.
225.00 conforming to IS:13607 with colour/shades, as decided by Engineer-in charge Note: DFT of each coat shall be 20-25 microns
7.80 101672.47 and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only.
141.00 less than 35 kg each at specified bridge locations. HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
40.00 opening or drilling in existing Brick Masonry / Plain / Reinforced Concrete abutment, wing wall/return wall with 110 mm dia UPVC pipe (working pressure 4kg/sqcm) extending through the full width of the structure complete and repairing the same with cement mortar 1:2 (1 cement : 2 coarse sand). Rate is excluding the cost of cement which shall be paid extra.
2.00 as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts.
79.00 (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in- charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant.
141.00 return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra.
250.00 from any location. Payment to be done for Horse power of pump multiplied by pumping hours.
60.00 procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance b e t w e e n nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
129.00 than 40 km and up to 50 km HUBLI DIVISION-ENGG/SOUTH WESTERN RLY First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
120.00 of 1660 Third or subsequent Through Packing of track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
60.00 of 1660 Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in- charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)
Each Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.
1.00 with winch assembly and other components like boom, fringes, locking arrangements, pedestal, boom rest, locking rods/wires, pulley stakes, turn out wheels, 'A' base and other materials connected with functioning of lifting barrier, removing engineering indicators on track and level crossing road signages without any damage including demolishing concrete base of existing structures, filling, ramming and levelling the ground disturbed during demolition, clearing debris and stacking all released material in a neat and countable manner and clear of infringements, as directed. Note: Barriers on both sides of level crossing constitute one set. Painting speed breakers with paint of approved quality & colour over the Bituminous/ Concrete surface near approaches to level crossing. HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
and sleepers/blocks required for matting and bearing as per approved design for use below and above CC Crib for insertion of Temporary Girder etc.. Note: The item is for one time use and released wooden sleepers/blocks shall be the property of the Contractor. Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
80.00 with minimum 1.10 cum bucket capacity
2500.00 layer by layer filled with Railway Sand/railway quarry dust in Contractor's empty polythene cement bags of 50 kg bags with all contractors labour, tools, plants, lead, lift etc., including stitching the same with machine using polythene thread complete as directed by Engineer-in charge at site. Total 26688419.35
Item Breakup - B-SCH-B
Sealing the joints of Pre cast RCC box units Running after placing it in to the correct position, Metre with cement mortar 12 Mix with Contractor's Cement of Approved quality including labours, tool & plants, loading, unloading, lead & lift etc complete as per the direction of the Engineer-in-charge
Supplying, providing, laying & fixing 5mm Sqm thick concrete canvas (flexible concrete impregnated fabric that hardens when hydrated to form a thin, durable water proof and fire resistance concrete layer within 24 hours) in limited height subway and other required work of Hubballi division, South Western Railway. 1) Contractor shall submit all relevant test certificates of the materials. 2) The adopted rates are deemed to include to all taxes (Direct or indirect), royalty, octoral etc. of Central Govt./State Govt. /Local body etc. and all the incidental charges. 3) Mass or unset concrete canvas should be 7Kg/M2. 4) The rate includes all the cost of lead, lift, loading, unloading, all type of transportation, ascent, descent, crossing of railway track, road, nullah wherever required, all contractor's labour, material to complete in all respect. HUBLI DIVISION-ENGG/SOUTH WESTERN RLY
Preparation of Completion plan- Preparation Each of completion plan and submission of the same to Railways with bridges completion certificate duly obtaining signature of SSE/Works or SSE/P Way and ADEN incharge of the work. The drawing to be submitted in original tracing paper or Tracing film with one soft copy. Total 2699325.00
Item Breakup - C-SCH-C
Each Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
MT-Km HUBLI DIVISION-ENGG/SOUTH WESTERN RLY Insertion of temporary girder in place of formation involving dismantling of track, removal of ballast and neatly stacking for future use, excavation & installation of CC crib or wooden crib at both ends as per approved design in one or more traffic blocks, excavation for creating space for insertion of girder as required, placement of girder by contractor's Crane, tools & plants, filling of earth/sand filled bags at different stages as required, linking of track and connecting with the approaches, ballasting, boxing and packing approach sleepers to make track fit for 20 kmph to the satisfaction of Engineer in-charge. Note: 1. The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. 2. Transportation of Temporary Girder to site shall be paid separately under relevant item. 3. The charges for wooden sleepers/blocks required for matting and bearing as per approved design shall be paid extra as per relevant item. 4. In case bridge timber / channel sleepers are required to be laid on girder, the same shall be paid separately under relevant item.
2.00 115440.23 16.3m and up to 26.00 using Road crane capacity of 80 MT Removal of temporary girder, crib on both ends and placing temporary girder on crib / cess away from Railway track as directed by engineer at site under traffic block; filling of Railway's earth by ramming, pulling ballast from stack / adjoining track / same track, laying track, linking with approach track and packing of ballast for opening track at 20 kmph speed, boxing & dressing of cess, ballast profiling etc. Note: If earth is to be brought by contractor from outside, the same will be paid separately.
2.00 127344.80 16.3m and up to 26.00 using Road crane capacity of 80 MT Total 2429076.26
Item Breakup - D-SCH-D
Item Breakup - A1-SCH-A1
43 approved brands/makes Total 4945001.26
Item Breakup - D2-SCH-D2
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocument6.1newasperACS.pdf
ATTACHMENT
IRGCCApril2022newasperACS.pdf
ATTACHMENT
JPOCirculardated22.05.2024.pdf
ATTACHMENT
NEFTFORM.pdf
ATTACHMENT
ACSItoXI_compressed.pdf
ATTACHMENT
AnnexureVGCCcorrespondence.pdf
ATTACHMENT
BGverificationletter_compressed.pdf
ATTACHMENT
SpecialconditionforLC112Centralsection.pdf Special Condition
ATTACHMENT
SpecialconditionforLC112Centralsection.pdf
ATTACHMENT
Download all tender documents and submit your bid