| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46.3 LAdmitted-Finance | -20.55% | ₹46.3 L | L1 | Admitted-Finance |
| 2 | L2₹47.8 L+₹1.5 L (3.27%)Admitted-Finance | -17.95% | ₹47.8 L+₹1.5 L (3.27%) | L2 | Admitted-Finance |
| 3 | L3₹49.5 L+₹3.2 L (6.99%)Admitted-Finance | -15.00% | ₹49.5 L+₹3.2 L (6.99%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-CHALLAN, CDR AND AFFIDAVIT NOT UPLOADED |
Tender Value
₹58.3 L
EMD Value
₹1.2 L
Closing Date
8 Sept 2026, 6:00 pmClosed
Executive Engineer PWD (RandB) Division Ramnagar.
Executive Engineer PWD (RandB) Division Ramnagar.
PLEASE REFER TO BOQ
2026_PWDJK_323208_10
e-NIT No. 57 of 2026-27 Dated- 02-09-2026
Open Tender
Civil Works
Percentage
180 days
RAMNAGAR
PLEASE REFER TO NIT
2 documents required · 2 mandatory
₹1,500
Executive Engineer PWD (RandB) Division Ramnagar.
₹1.2 L
18 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
8 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kind of soil 80% | 52.2 | Cum | 256.85 | ₹13,407.57 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary roack 20% | 13 | Cum | 493.5 | ₹6,415.5 |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kind of soil 80% | 19 | Cum | 81.65 | ₹1,551.35 |
| 4 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : Ordinary roack 20% | 4.5 | Cum | 146.45 | ₹659.03 |
| 5 | Providing and laying P.C.C in 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size) | 54.03 | Cum | 5,202.9 | ₹2,81,112.69 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) crushed | 25.85 | Cum | 7,788.4 | ₹2,01,330.14 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 3.69 | Cum | 9,821.85 | ₹36,242.63 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level and above plinth level :-Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,547.15 | kg | 123.2 | ₹4,37,008.88 |
| 9 | FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases for columns | 8.55 | sqm | 286.35 | ₹2,448.29 |
| 10 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 127.88 | sqm | 628.95 | ₹80,430.13 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1087187.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .