| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance ERIKKADU THERMAL POST METTUR DAM 636 406 | METTUR DAM | SALEM | TAMIL NADU | 636406 | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹15.2 L (14.8%)Admitted-Finance NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | ₹1.2 Cr+₹15.2 L (14.8%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹19.7 L (19.2%)Admitted-Finance | ₹1.2 Cr+₹19.7 L (19.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹22.6 L (22.0%)Admitted-Finance NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | CHENNAI | TAMIL NADU | 600019 | ₹1.3 Cr+₹22.6 L (22.0%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical KULLANDI STREET PALLIPATTI PO METTUR TK SALEM 636458 | SALEM | SALEM | TAMIL NADU | 636458 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | NVS and Co L1 | Sp Constructions L2 | MSS CONTRACTORS L3 | KR CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead of 10m and lift of 2m, etc., complete. | 252 | Cum | - | - | - | - |
| 2.00 | Earth work excavation for foundation in soft disintegrated rock, latarite soft rock or kankar not riquiring blasting with an initial lead of 10 m and lift of 2m etc., complete. | 189 | Cum | - | - | - | - |
| 3.00 | Earthwork excavation in medium rock and dense medium rock not requiring blasting with an initial lead of 10m and lift of 2m etc., complete. | 189 | Cum | - | - | - | - |
| 4.00 | Supplying and filling of river sand in foundation well water and consolidation as per specn.including cost of all materials labour, lead, lift, etc., complete. | 50 | Cum | - | - | - | - |
| 5.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete. | 50 | Cum | - | - | - | - |
| 6.00 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials,water charges, labour lead, lift, etc., complete. | 235 | Cum | - | - | - | - |
| 7.00 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for retaining wall concrete with formwork including cost of all materials, water charges labour lead, litf, etc., complete. But excliding cost fo steel reinforcement (by using mixer machine). Upto 4.5 m height | 143 | Cum | - | - | - | - |
| 8.00 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for retaining wall concrete with formwork including cost of all materials, water charges labour lead, litf, etc., complete. But excliding cost fo steel reinforcement (by using mixer machine). above 4.5 m height | 95 | Cum | - | - | - | - |
| 9.00 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. | 47,300 | Kg | - | - | - | - |
| 10.00 | Supplying and laying and fixing of 75mm dia PVC pipe to resist 6Kg/cm2 water pressure to proper alignment & slope for weep holes as required and as directed by the Engineer at site including cost of pipe and fixing in position, testing all matrials solution , lead, lifts etc., complete. | 100 | m | - | - | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
29 Jan 2020, 2:00 pmClosed
Chief Engineer/Distribution/Coimbatore
Chief Engineer/Distribution/Tatabad/Coimbatore
Construction of RCC retaining wall adjacent to the existing Division office and proposed 11 KV Yard in order to safe guard the yard structures of the proposed Sims Park 33/11 KV Sub Station at Coonoor in Nilgiris District.
2020_EB_153677_1
CE/D/CBE/Civil/No.07/2019-20
Open Tender
Civil Works
Item Rate
90 days
Coonoor
As per BQR specified in the specification
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
19 Mar 2020
13 Jan 2020
29 Jan 2020
13 Jan 2020
29 Jan 2020
15 Jan 2020
Amount
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead of 10m and lift of 2m, etc., complete.
Earth work excavation for foundation in soft disintegrated rock, latarite soft rock or kankar not riquiring blasting with an initial lead of 10 m and lift of 2m etc., complete.
Earthwork excavation in medium rock and dense medium rock not requiring blasting with an initial lead of 10m and lift of 2m etc., complete.
Supplying and filling of river sand in foundation well water and consolidation as per specn.including cost of all materials labour, lead, lift, etc., complete.
PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials,water charges , lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials,water charges, labour lead, lift, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for retaining wall concrete with formwork including cost of all materials, water charges labour lead, litf, etc., complete. But excliding cost fo steel reinforcement (by using mixer machine). Upto 4.5 m height
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for retaining wall concrete with formwork including cost of all materials, water charges labour lead, litf, etc., complete. But excliding cost fo steel reinforcement (by using mixer machine). above 4.5 m height
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Supplying and laying and fixing of 75mm dia PVC pipe to resist 6Kg/cm2 water pressure to proper alignment & slope for weep holes as required and as directed by the Engineer at site including cost of pipe and fixing in position, testing all matrials solution , lead, lifts etc., complete.
Refilling the foundation and wall with excavated earth and well consolidatioand compacted well rammed with all leads and lifts , watering, as per standard specification, etc., complete.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Sp Constructions
MSS CONTRACTORS
KR CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_184582.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .