Loading…
Loading…
Tender Value
₹79,000
EMD Value
₹3,950
Closing Date
5 Oct 2026, 6:55 pm
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
CONSTRUCTION OF DRAIN FROM FISH FORM TO POSHKAR ROAD AND REPAIRMENT OF SHEIKH SPRING BATHROOM LOHREN KHAG-A
2026_RDPR_325393_149
NIT_78_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
KHAG
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹3,950
21 Sept 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil : | 11.04 | Cum | 479.3 | ₹5,291.47 |
| 2 | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches excluding carriages of Stones. | 3.35 | Cum | 937 | ₹3,138.95 |
| 3 | P/L in position cement concrete of M 7.5 Grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :4 F.A.(Natural/M-Sand) :8 C.A. ) with 40mm aggregate | 1.82 | Cum | 5,202.9 | ₹9,469.28 |
| 4 | P/L in position cement concrete of M10 Grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 6.11 | Cum | 5,733.6 | ₹35,032.3 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 24.16 | Sqm | 286.35 | ₹6,918.22 |
| 6 | 12 mm thick cement sand plaster in 1:6 mix | 24.16 | Sqm | 266.2 | ₹6,431.39 |
| 7 | carriage of stone aggregate 40 mm for an avg lead of 15 km | 1.64 | Cum | 374.49 | ₹614.16 |
| 8 | carriage of stone aggregate 20 mm for an avg lead of 15 km | 5.58 | Cum | 344.49 | ₹1,922.25 |
| 9 | carriage of sand fro an avg lead of 15 km | 3.57 | Cum | 344.49 | ₹1,229.83 |
| 10 | carriage of soling for an avg lead of 15 km | 3.35 | Cum | 344.49 | ₹1,154.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_1099451.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .