| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97,030.27Accepted-AOC | L1 | Accepted-AOC Quoted less than Tender Value | |
| 2 | L2₹98,778.98+₹1,748.71 (1.80%)Rejected-AOC S A | L2 | Rejected-AOC Quoted more than Tender Value |
| Sl No | Description | Qty | Unit | S A Srinivasan L2 | K.Sethupathi L1 |
|---|---|---|---|---|---|
| 1.00Vellore District Maintainance of the Road from NH to Chinnamuthunaiyakanpatti Road Km 0/0 - 0/550 (R490) at Eraivangadu Panchayat Anaicut Block IRRMA Scheme 2025-2026 Package no 30 | |||||
| 2.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 6 | cum | 2,966.54 ₹17,799.24 | 2,914.06 ₹17,484.36 Lowest |
| 3.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST | 48 | Sqm | 86.49 ₹4,151.52 | 84.96 ₹4,078.08 Lowest |
| 4.00 | Applying tack coat over prime surface using 2.5 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST | 48 | Sqm | 19.54 ₹937.92 | 19.19 ₹921.12 Lowest |
| 5.00 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 1.2 | cum | 11,709.61 ₹14,051.53 | 11,502.47 ₹13,802.96 Lowest |
| 6.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | 3.25 | cum | 4,132.16 ₹13,429.52 | 4,059.06 ₹13,191.95 Lowest |
| 7.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 216 | Sqm | 33.68 ₹7,274.88 | 33.08 ₹7,145.28 Lowest |
| 8.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 5.4 | cum | 4,827.11 ₹26,066.39 | 4,741.72 ₹25,605.29 Lowest |
| 9.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | 15,067.98 ₹15,067.98 | 14,801.23 ₹14,801.23 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
14 Nov 2025, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER
THE BLOCK DEVELOPMENT OFFICER,ANAICUT
Vellore District Maintainance of the Road from NH to Chinnamuthunaiyakanpatti Road Km 0/0 - 0/550 (R490) at Eraivangadu Panchayat Anaicut Block IRRMA Scheme 2025-2026 Package no 30
2025_RDTN_621350_1
A2/3664/2025 ACT NOV 57-25
Open Tender
Civil Works
Item Rate
180 days
THE BLOCK DEVELOPMENT OFFICE, ANAICUT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,000
12 Dec 2025
8 Nov 2025
14 Nov 2025
8 Nov 2025
14 Nov 2025
8 Nov 2025
Amount
Vellore District Maintainance of the Road from NH to Chinnamuthunaiyakanpatti Road Km 0/0 - 0/550 (R490) at Eraivangadu Panchayat Anaicut Block IRRMA Scheme 2025-2026 Package no 30
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
Applying tack coat over prime surface using 2.5 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
S A Srinivasan (BID ID -1511387)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_742971.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tendernotice_2.pdf
PDF • 0.39 MB
BOQ_742971.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .