Tender Value
₹92.4 L
EMD Value
₹1.8 L
Closing Date
9 Sept 2026, 3:00 pm
Samit Talukder, EE, NBDD
Uttarkanya, Fulbari, Jalpaiguri
Construction of CC Road from Diipur More to Debottar Bakshiganj Shamshan at Debottar Bakshiganj Village under Dakhshin Baro Haldibari GP within Haldibari Block in the district of Coochbehar. (Length- 1200 mtr, Width- 2.5 mtr)
2026_NBDD_1039497_4
NBDD/BS/EE/ NIe-T- 47/2026-27
Open Tender
CIVIL WORKS
Percentage
300 days
Cooch Behar
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.8 L
Yes
25 Aug 2026
25 Aug 2026
11 Sept 2026
25 Aug 2026
9 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (pre work post workmeasurement)
b) Carriage upto total lead of 2.00 km | 3,366 | CUM | 306.73 | ₹10,32,465.18 |
| 2 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (pre work post workmeasurement) | 594 | CUM | 112.98 | ₹67,111.69 |
| 3 | By Mix in Place Method
Construction of granular sub-base by providing graded materials such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator and compacting with vibratory roller to
achieveat least 98%of themaximum dry density for the material
determined as per IS:2720 (Part 8), complete as per clause 401 desired density, complete as per clause 401
ii) Rate per cum for grading-II Material | 459 | m³ | 2,985.82 | ₹13,70,489.79 |
| 4 | Plain/Reinforced cement concrete in open foundation complete all
including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H'sspecifications1500,1700& 2200).
PCC Grade M15 | 229.5 | m³ | 6,254.55 | ₹14,35,420.25 |
| 5 | Plain/Reinforced cement concrete in open foundation complete all
including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H'sspecifications1500,1700& 2200).
PCC Grade M20 | 382.5 | m³ | 6,824.2 | ₹26,10,256.17 |
| 6 | Supplying and laying Polythene Sheet (150gm / sq.m.) over
damp proof course or below flooring or roof terracing or in
foundation or in foundation trenches. | 3,240 | m² | 28.6 | ₹92,674.37 |
| 7 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (Reference to MORT&H's specification 304).Manual Means -Depth upto 3 m | 149.57 | m³ | 409.12 | ₹61,193.88 |
| 8 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
(a) Single layer boulder soling | 82.5 | m² | 345.11 | ₹28,471.54 |
| 9 | Plain cement concrete 1:3:6 nominal mix in foundation with
crushed stone aggregate 40 mm nominal size mechanically mixed,
placed infoundationand compacted by vibration including curing for 14 days (Reference to MORT&H's specification 2100). | 12.38 | m³ | 5,484.07 | ₹67,892.76 |
| 10 | Plain/Reinforced cement concrete in open foundation complete all
including vibrating and compacting, finishing, curing, sampling, testing etc. as per drawing and Technical Specifications (Reference to MORT&H'sspecifications1500,1700& 2200).
PCC Grade M15 | 91.08 | m³ | 6,254.55 | ₹5,69,664.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2552750.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].