Tender Value
₹59.5 Cr
EMD Value
₹1.2 Cr
Closing Date
28 Oct 2026, 3:00 pm
No
No
Two Packet System
Two Stage Reverse Auction
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
Above/Below/Par
TRD BSL
19 conditions · 6 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB(available in GCC), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. (In case, the tenderer fails to submit Annexure VIB and/or Audited Balance Sheets, the offer will be summarily rejected).
The tenderer will be qualified only if its available bid capacity is equal to or more than the total bid value of the present tender. The available bid capacity shall be calculated as under: Available Bid Capacity = [A x N x 2] - 0.33xNxB Where, A = Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender), taking into account the completed as well as works in progress. N= Number of years prescribed for completion of work for which bids has been invited. B = Existing commitments and balance amount of ongoing works with tenderer as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to tenderer but yet not started upto the date of inviting of tender. ACS No. 1 of 14.07.2022 Note: (a) The Tenderer(s) shall furnish the details of - (i) Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender) for calculating A, and (ii) Existing commitments and balance amount of ongoing works with tenderer as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to tenderer but yet not started upto the date of inviting of tender for calculating B. In case of no works in hand, a 'NIL' statement should be furnished. The submitted details for (i) and (ii) above should be duly verified by Chartered Accountant. (b) In case if a bidder is JV, the tenderer(s) must furnish the details of (i) Maximum value of construction works executed and payment received in any one of the previous three financial years or the current financial year (up to date of inviting tender) by each member of JV for calculating A, and (ii) Existing commitments and balance amount of ongoing works with each member of JV either in individual capacity or as a member of other JV as per the prescribed proforma of Railway for statement of all works in progress and also the works which are awarded to each member of JV either in individual capacity or as a member of other JV but yet not started upto the date of inviting of tender for calculating B. In case of no works in hand, a 'NIL' statement should be furnished. The submitted details for (i) and (ii) above should be duly verified by Chartered Accountant (c) Value of a completed work/work in progress/work awarded but yet not started for a Member in an earlier JV shall be reckoned only to the extent of the concerned member's share in that JV for the purpose of satisfying his/her compliance to the above mentioned bid capacity in the tender under consideration. (d) The arithmetic sum of individual "bid capacity" of all the members shall be taken as JV's "bid capacity". (e) In case, the tenderer/s failed to submit the above statement along with offer, their/his offer shall be considered as incomplete and will be rejected summarily. (f) The available bid capacity of tenderer shall be assessed based on the details submitted by the tenderer. In case, the available bid capacity is lesser than estimated cost of work put to tender, his offer shall not be considered even if he has been found eligible in other eligibility criteria.
NOTE: Bid capacity submitted for any date prior to the date of invitation of the tender shall not be accepted. The statement of existing commitments and balance amount of ongoing works (including all works in progress and works awarded but not yet started upto the date of invitation of the tender) for calculating 'B' shall not be prior to the date of tender invitation. In case the tenderer has no works in hand, a 'NIL' statement shall be submitted. If the bid capacity or the statement of existing commitments is based on any date earlier than the date of invitation of the tender, or is not updated as on the date of invitation of the tender, the offer shall be summarily rejected.
4 conditions · 2 needing a document upload
In case of other than Company/Proprietary firm, Annexure -V(A) shall be submitted by each member of Partnership Firm / Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may be. Non submission of above certificate(s) by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self-attested/digitally signed by which they / he is qualifying the Qualifying Criteria mentioned in the Tender Document. Format of Annexure VA is available in GCC April'2022 uploaded with the tender. (If these documents are not applicable, firm may upload a pdf with remark "Not applicable" )
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
a. List of personal organization available on hand and proposed to be engaged for the subject work. b. List of Plant & Machinery available on hand (own) and proposed to be inducted (own & hired to be given separately) for the subject work. c. List of works completed in the last three financial year giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of schedule completion of work. Date of actual start, actual completion and final value of contract should also be given. d. List of works on hands indicating description of work, contract value, approximate value of balance work yet to be done and date of award.
Supply and installtion of 96 F OPGW Cable as AEC for 25 kV AC Traction System in Bhusawal Division.
BSL_ELECT_TRD_53_2026~CR
BSL_ELECT_TRD_53_2026
Open
Works - General
24 Months
Jalgaon, Maharashtra
₹0
₹1.2 Cr
26 Sept 2026
26 Sept 2026
14 Oct 2026
214 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 12,79,98,236.57 | ||
| — | 155.00 | — | — | ||
| Supply of 96Fibre (DWSM) OPGW fibre optic cable. | — | — | — | 7,73,20,975 | |
| — | 2940.00 | — | — | ||
| Supply of suspension clamp assembly for 96 Fibre OPGW without Jumper | — | — | — | 91,32,669 | |
| — | 2940.00 | — | — | ||
| Supply of Copper Jumper | — | — | — | 17,43,273 | |
| — | 50.00 | — | — | ||
| Supply of Tension fiiting Assembly for 96Fibre OPGW (JB) | — | — | — | 3,29,043 | |
| — | 100.00 | — | — | ||
| Supply of Tension Assembly for dead end for 96Fibre OPGW | — | — | — | 3,29,574 | |
| — | 50.00 | — | — | ||
| Joint box for 96Fibre OPGW | — | — | — | 8,00,394 | |
| — | 155.00 | — | — | ||
| Installation of OPGW 96F Cable with associated hardware | — | — | — | 2,51,94,475 | |
| — | 50.00 | — | — | ||
| OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F | — | — | — | 50,40,600 | |
| — | 50.00 | — | — | ||
| Installation of FODP 96F | — | — | — | 7,56,090 | |
| — | 74.00 | — | — | ||
| Supply of Pastorate pre-fabricated OFC jointing pits RCC chamber of size 1m x 1m x 0.5m. | — | — | — | 3,06,948.3 | |
| — | 74.00 | — | — | ||
| — | 1.50 | — | — | ||
| Supply of access/Approach cable | — | — | — | 3,25,902 | |
| — | 1.50 | — | — | ||
| Erection, testing and commissiong of access/Approach cable | — | — | — | 1,58,290.93 | |
| — | 294.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS11toGCC2022_compressed.pdf ACS 11
ATTACHMENT
GCC 2022 with ACS10
ATTACHMENT
BookletOPGWBSL_compressed.pdf Booklet with Specifications
ATTACHMENT
ACS 12
ATTACHMENT
Soleproprietorcertificatepdf.pdf
ATTACHMENT
GCC-2022-ACS10_merged_compressed.pdf
ATTACHMENT
ACS11toGCC2022_compressed.pdf
ATTACHMENT
BookletOPGWBSL_compressed.pdf
ATTACHMENT
ACS12toGCC2022dtd12-08-2026_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .