Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.6 L
EMD Value
₹12,610
Closing Date
25 Nov 2026, 5:30 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Officer
RURAL WORKS DIVISION NO.II, CUTTACK
1) RD Road Banahara Road OR0789 _Clubbing Package no OR-07-PM-35
2026_CERWI_146082_1
08 of 2026-27
Open Tender
Miscellaneous Works
Percentage
60 days
Cuttack
2 documents required · 2 mandatory
₹6,000
₹12,610
Yes
13 Nov 2026
13 Nov 2026
26 Nov 2026
13 Nov 2026
25 Nov 2026
13 Nov 2026
13 Nov 2026 - 25 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Flank dressing to proper camber etc complete as per the direction of the Engineer-in-Charge. | 2,250 | sqm | 7.16 | ₹16,110 |
| 2 | Scrapping cleaning road surface applying tack coat using 3.00 kg of Bitumen for 10 sqm and laying 37.5 mm thick BUSG in one layer using 0.45 cum of 25 mm to 40 mm size Granite metal and 12.00 kg Bitumenof penetration Grade for 10 sqm with 0.12 cum of 12 mm size chips as key stone for 10 sqm spreading over and laying including heating pouring and spreading over and preading bitumen metal chips and rolling with PRR including hire and running charges of PRR and all other machineries including cost and conveyance of all materials etc complete as per direction of Engineer-in-charge. | 155.62 | sqm | 440.89 | ₹68,611.3 |
| 3 | Cleaning the existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bitumenous etc complete as per dierection of Engineer-in-Charge. | 2,340 | sqm | 5.66 | ₹13,244.4 |
| 4 | Providing and applying Tack Coat with bitumen using Pressure distributor @ 0.20kg/sqm on the prepared surface cleaned with mechanical brooms as per clause 503 of MOSRT & H Specifications etc complete as per the direction of Engineer-in-Charge. | 2,340 | sqm | 20.61 | ₹48,227.4 |
| 5 | Providing and laying S.D.B.C of 25mm thick on prepared surface and laying with paver finisher to the required level rolling with paver finisher etc complete as per the direction of Engineer-in-Charge. | 58.5 | cum | 14,869.77 | ₹8,69,881.55 |
| 6 | Construction of embankment with approved materials obtained from borrow pits with all leads and lifts transporting to site,spreading, grading to required slope and compacting at OMC by Vibratory Roller to meet the requirement of Table-300.2 as per Clause 305 of MoRT&H Specifications dfor Road & Bridge works(4th Revision) complet including cost,conveyance,Royalities,Taxes of all materials,all labours,hire and running charges of all machineries,T&P ,sundries etc. complete as per spcification and direction of Engineer-in-Charge. | 100 | cum | 198.68 | ₹19,868 |
| 7 | Earth work in excavation for structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m,dressing of sides and bottom and backfilling in trenches excavated suitable material. etc complete as per the direction of Engineer-in-Charge. | 23.1 | cum | 315.46 | ₹7,287.13 |
| 8 | Filling in foundation trenches as per drawing and technical specification clause 305.3.9 including cost conveyance royalty of sand and labour etc complete as per the direction of Engineer-in-Charge. | 2.89 | cum | 853.75 | ₹2,467.34 |
| 9 | Providing PCC M-10 concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specification clause 802,803,1202,1203 etc complete as per the direction of Engineer-in-Charge. | 4.33 | cum | 5,292.39 | ₹22,916.05 |
| 10 | Providing PCC M-15 concrete for plain/reinforced concrete in Substructure complete as per drawings and technical specification clause 802,803,1202,1203 etc complete as per the direction of Engineer-in-Charge. | 30.71 | cum | 6,133.44 | ₹1,88,357.94 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.06 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_620629.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .