Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 CrAccepted-AOC | ₹10.1 Cr | L1 | Accepted-AOC BOND CREATED |
| 2 | L2₹11.1 CrRejected-Finance 56 LAKSHMANPUR COLONY ALLAHABAD ROAD SULTANPUR | SULTANPUR | SULTANPUR | UTTAR PRADESH | ₹11.1 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFY |
| 4 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFY |
| 5 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFY |
Tender Value
₹10 Cr
EMD Value
₹20 L
Closing Date
17 Feb 2020, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Under State Road Fund Widening and Strengthening of Sagra Pahadpur Purabgaon in District Pratapgarh
2020_CEALD_431326_1
176/93C/etendering/P.F.C/2020 Dt 10.1.2020
Open Tender
Civil Works
365 days
PBH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
Exn. Engg.Construction Division 2, PWD, PRATAPGARH
₹20 L
Pratapgarh Circle, PWD, Pratapgarh
28 Mar 2020
5 Feb 2020
17 Feb 2020
5 Feb 2020
17 Feb 2020
5 Feb 2020
7 Feb 2020
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Compaction of earth work in embankment of trench. Same as item no. 1.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Scraping old painted surface including diposal of all scraped material to a distance of 30mtrs. as directed by the engineer in charge. S.I. 772.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Construction of granular sub-base coarse by providing coarse graded Material, grading one spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density, complete as per clause 401..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, with 1% OPC cement & 3.5% emulsion laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing & applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 Kg/ sqm using mechanical means..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared Primed surface/bitumen surface cleaned with mechanical broom for B.C..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying bituminous concrete 30 mm thick with 100-120 TPH batch type H.M.P. producing and average output of 75 tonne per hour using hard crushed aggregates of specified grading premix with bituminous binder grade VG-30 @ 5 percent of mix and filler, transporting the hot mix to work site , laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compection as per M.O.R.T & H specification clause 509 complete in all respects ..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 80-100 KN capacity, finished to required level and grades to followed by seal coat..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying seal coat Type C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall ..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Providing and laying 40 mm gauge brick ballast below pipe and in sides..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supply of 350 mm dia NP3 pipe..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
laying & fixing of 350 mm dia NP-3 pipe with collers.including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Class 150 brick work in foundation and plinth with cement mortar 1:3 (1Cement :3 Coarse sand).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Struck Cement Pointing on Brick work with cement mortar 1:3 (1 Cement : 3 Fine sand) .including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
12mm cement plaster in 1;3 cement & coarse sand mortar..including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plain/Reinforced cement concrete in open foundation completed as per drawing and techincal specifications.(P.C.C.-M-15).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Plain/Reinforced cement concrete in open foundation completed as per drawing and techincal specifications.(R.C.C.-M-20).including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.clauses 1000 & 1202 .including all materials, labours etc. for proper completion of work as per direction of E/I but GST will be paid extra as per prevelling rules.
KUMAR TRADERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid