Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.1 LAdmitted-Finance | -26.13% | ₹16.1 L | L1 | Admitted-Finance |
| 2 | L2₹16.3 L+₹10,274.83 (0.64%)Admitted-Finance | -25.66% | ₹16.3 L+₹10,274.83 (0.64%) | L2 | Admitted-Finance |
| 3 | L3₹16.5 L+₹33,447.85 (2.07%)Admitted-Finance | -24.60% | ₹16.5 L+₹33,447.85 (2.07%) | L3 | Admitted-Finance |
| 4 | L4₹17.0 L+₹90,068.74 (5.58%)Admitted-Finance | -22.01% | ₹17.0 L+₹90,068.74 (5.58%) | L4 | Admitted-Finance |
| 5 | L5₹17.3 L+₹1.2 L (7.15%)Admitted-Finance | -20.85% | ₹17.3 L+₹1.2 L (7.15%) | L5 | Admitted-Finance |
Tender Value
₹21.9 L
EMD Value
₹43,730
Closing Date
27 Jul 2026, 2:00 pmClosed
AGM(CE)
FCI RO ASSAM
Colouring works of Sheds, Ancillaries and Boundary wall as per newly approved colour pattern
2026_FCI_917481_1
CE/07/2026-27
Open Tender
Civil Works
Percentage
45 days
FCI FSD Dhemaji
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹43,730
FCI RO ASSAM
2 Sept 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | - | cum | 3,455.37 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | - | cum | 6,628.08 | - |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1 | sqm | 17.12 | ₹17.1 |
| 4 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | - | sqm | 19.22 | - |
| 5 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | - | Sqm | 24.47 | - |
| 6 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | 53.17 | - |
| 7 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | - | sqm | 324.35 | - |
| 8 | 15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand) | - | sqm | 372.66 | - |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | 8,860.09 | ₹8,851.23 |
| 10 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | - | sqm | 151.84 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_964173.xls
BOQ • 0.35 MB
MTFARMODMJ3CALL.pdf
Tender Documents • 2.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .