Loading…
Loading…
Tender Value
₹28.3 L
EMD Value
₹35,500
Closing Date
16 Jul 2026, 11:00 am
S.O.(CIVIL)
S.O.(CIVIL) Khadia Area Dist.-Sonebhadra U.P. PIN 231222
Heightening of weighbridge No. 3 and 4 and other allied works at Khadia Project
2026_NCL_361661_1
- GM/KHD /C/26-27/ETN-07 Date 04/07/2026
Open Tender
Civil Works - Others
60 days
Khadia Area Dist.-Sonebhadra U.P.
REFER NIT
3 documents required · 3 mandatory
₹35,500
4 Jul 2026
4 Jul 2026
17 Jul 2026
4 Jul 2026
16 Jul 2026
5 Jul 2026
4 Jul 2026 - 9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Item Description/ Heading | - | - | - | - |
| 1CIVIL PART | |||||
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of
steel bars and disposal of unserviceable material within 50 metres lead as per
direction of Engineer - in- charge. | 31 | cum | 1,950.95 | ₹60,479.45 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size). | 27 | cum | 5,402.95 | ₹1,45,879.65 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level : 1:1.5:3(1cement:1.5coarse sand (zone-III):3 graded stone aggregate 20 mm nominal size). | 36 | cum | 6,908.3 | ₹2,48,698.8 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 3,600 | Kg | 101.25 | ₹3,64,500 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 27 | sqm | 479.6 | ₹12,949.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts | 93 | sqm | 554.6 | ₹51,577.8 |
| 8 | Earth work in excavation in all kind of soil/ silt by
mechanical means (hydraulic excavaror)/ manual
means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL) Lead upto 1.00 KM | 567 | cum | 37.07 | ₹21,018.69 |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,996 | kg | 115.05 | ₹3,44,689.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_374550.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid