EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF SHORT LINK ROAD WITH BOX TYPE CULVERT FROM MAIN ROAD TO KRALBANJAR NEAR H/O PARVAIZ AHMAD KHAN AND LAND OF AYAZ AHMAD YATOO, MUZZAFAR AHMAD YATOO, MOHD MAQBOOL YATOO AND OTHERS.
2026_RDPR_299923_13
NIT_104_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
Chadoora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹7,425
6 Jan 2026
6 Jan 2026
14 Jan 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering Wing Division Budgam, Kashmir. Tender Inviting Officer: Executive Engineer Rural Engineering Wing Budgam.
Construction of short link road with box type culvert from main road to kralbanjar near the house of parvaiz ahmad khan and land of ayaz ahmad yatoo muzaffer ahmad yatoo mohd maqbool yatoo and others at hushroo Scheme: cdF
Contract No: of 2025-26 DATED: Adv cost =Rs1.48500 halqa HUSHROO
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
0_) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by the Engineer in-charge BI01010001010000000000000515BI0100001117 cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and Laying of stone soling hand-packed on level in foundation; complete job including the cost of carriage for an average lead of 10 km from the source BI01010001010000000000000515BI0100001118 cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Twenty One Thousand Two Hundred & Seventy Seven and Paise Thirty Only
0_) Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size BI01010001010000000000000515BI0100001119 cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Six Thousand Three Hundred & Twenty Two and Paise Eighty Seven Only
0_) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteringl.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size BI01010001010000000000000515BI0100001120 cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Twenty Four Thousand Seven Hundred & Twenty Three and Paise Fourteen Only
0_) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutteringl.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) BI01010001010000000000000515BI0100001121 cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Twenty One Thousand Eight Hundred & Forty Five and Paise Forty Only
0_) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Mild steel and medium tensile steel bars BI01010001010000000000000515BI0100001122 qtl _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Fifty Five Thousand Three Hundred & Fifteen Only
0_) Centering and shuttering including strutting propping etc. and removal of form work. BI01010001010000000000000515BI0100001123 sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Four Thousand Six Hundred & Forty Four and Paise Sixty Four Only
0_) Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms BI01010001010000000000000515BI0100001124 sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Six Thousand Six Hundred & Seventy Two and Paise Eight Only
0_) Carriage of sand/bajree by MT 15 KMS avg lead. BI01010001010000000000000515BI0100001125 cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR INR Three Thousand &Eighty Three and Paise Thirty Nine Only
0_) signboard & photographs + carriage of cement and other materials & Other miscellenous items BI01010001010000000000000515BI0100001126 Job Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Sixty Nine and Paise Seventy Nine Only
Total in Figures INR One Lakh Forty Eight Thousand Five Hundred Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_973069.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .