Tender Value
₹12.9 L
EMD Value
₹12,900
Closing Date
11 Mar 2022, 4:00 pmClosed
Executive Engineer, Panipat Water Services Divisio
Executive Engineer, Panipat Water Services Division, Panipat
Protection of village pond agriculture land and abadi of village Mehrana from flood by excavating Mehrana Drain at existing alingment from RD 0 to 3900
2022_HRY_210008_1
Protection of village pond Mehrana Drain RD0to3900
Open Tender
Civil Works
Works
180 days
Executive Engineer, Panipat Water Services Divisio
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
₹12,900
Yes
7 Jul 2022
2 Mar 2022
11 Mar 2022
2 Mar 2022
11 Mar 2022
2 Mar 2022
Amount
Earth work excavation i/c all lead, lifts and all other allowances with an avg. lead of 60 mtr. Old HSR 6.2 (b) & (c)
Rehandling of earth work with an average lead of 60 mtr. Old HSR 6.2(b) (c) & Note-II
Puddling of earth work. Old HSR 6.2 (f)
Preparing watering and ramming surface for laying C.C. in Horizontal as per PWD specification and design and as per direction of engineer incharge Old HSR 10.122 (b) (i)
Cement concrete 1:3:6 with stone aggregate 20mm nominal size in foundation & plinth. Old HSR 10.40
1st class brick work in CM 1:3 in foundation & plinth. Old HSR 11.5
1st class brick work laid in cmement sand mortar 1:3 in super structure. Old HSR 11.10
Cement concrete 1:2:4 with stone aggregate 20mm nominal size in F&P. Old HSR 10.41
RCC 1:1.5:3 with stone aggregate 20mm nominal size in F&P. Old HSR 10.79+10.95 (a)
RCC 1:1.5:3 with stone aggregate 20mm nominal size in super structure. Old HSR 10.80+10.95 (a)
Centering and shuttering for faces of foundation concrete foundation beams etc.(Old HSR 9.13)
Centering and shuttering side soffits. Old HSR 9.5
Centering & shuttering for bottom slab. Old HSR 9.18(b)
Providing & fixing drainage spout
Filling expension joint with sail tax board.
Supply & fixing caution/ sign boards on both side
Earth work excavation of ordinary soil including alllead lift with an av. Lead of 30 Mtrs.
Rehandling of earth work with an average lead of 30 mtr. Old HSR 6.2(b) (c) & Note-II
Sand filling behind pucca structure as per PWD specification and design and as per direction of engineer incharge
Compaction of Earth work as per PWD specification and design and as per direction of engineer incharge Old HSR 6.2 g (i) (ii) & (v)
Laying dry brick bats. Old HSR 10.116
Supply of TMT bars for R.C.C. works I/C bending binding and placing in position (FE 500, TMT Steel bars) of TISCO, SAIL,RINL or IISCO (Old HSR 18.22)
Earth work excavation with in avg. lead of 15 Mtr.
C.C. 1:4:8 with stone aggregate 20mm nominal size in foundation & plinth. Old HSR 10.38
12 mm thick Cement Plaster 1:4 as per PWD specification and as per direction of engineer-in-charge. Old HSR 15.5
Cement concrete 1:2:4 with stone aggregate 20mm nominal size in F&P. Old HSR 10.41
Preparing watering and ramming surface for laying C.C. in glacis as per PWD specification and design and as per direction of engineer incharge Old HSR 10.122 (b) (ii)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .