Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-Finance | ₹1.2 Cr | 1 | Accepted-Finance Accept |
| 2 | 2₹1.2 Cr+₹6.4 L (5.55%)Accepted-Finance | ₹1.2 Cr+₹6.4 L (5.55%) | 2 | Accepted-Finance Accept |
| 3 | 3₹1.3 Cr+₹9.0 L (7.78%)Accepted-Finance | ₹1.3 Cr+₹9.0 L (7.78%) | 3 | Accepted-Finance Accept |
| 4 | 4₹1.3 Cr+₹9.2 L (7.97%)Accepted-Finance | ₹1.3 Cr+₹9.2 L (7.97%) | 4 | Accepted-Finance Accept |
Tender Value
₹1.2 Cr
EMD Value
₹1.3 L
Closing Date
18 Nov 2021, 11:00 amClosed
Deputy Conservator of Forest, UT, Chandigarh
Paryavaran bahwan, 2nd Floor, Madhya Marg, Sector 19B, Chandigarh
Suppressing of lantana, construction work, repair work other work etc
2021_CHD_63265_1
FOR/21/2744/12.11.2021
Open Tender
Composite Works
Item Rate
365 days
Chandigarh
As per tender document
6 documents required · 6 mandatory
₹0
₹1.3 L
Yes
17 Jan 2022
13 Nov 2021
18 Nov 2021
13 Nov 2021
18 Nov 2021
13 Nov 2021
13 Nov 2021 - 18 Nov 2021
Amount
Item with Detailed Specifications
Suppressing of lantana in U/Lower Ghareri beats in Ghareri Block, Nepli Range during 2021-22
Repair & Strengthening of Khedaywala Dam No. 1 in Ghareri Beat, Ghareri Block, Nepli Range during 2021-22
Construction of Causeway to on approach way to ChamranWala dam in lower Ghareri Beat, Ghareri Block, Nepli Range during 2021-22
Repair of Spillway of Dam in ChamaranWala Dam No. 2 in upper Ghareri Beat, Gharerii Block, Nepli Range during 2021-22
Construction of Causeway to an approach way to JulahWala dam in lower Ghareri Beat, Ghareri Block, Nepli Range during 2021-22
Repair of side wall construction of Apron and strengthening of Dam No. 2 in KhedaywalaChoe, Lower Ghareri Beat, Ghareri Block, Nepli Range during 2021-22.
Repair of spillway of Dam No. 4 in JulaheWalaChoe, Lower Ghareri Beat, Ghareri Block, Nepli Range during 2021-22
Construction of retaining wall along ghareri main road in front of Chamaranwalachoe in upper Ghareri beat, Ghareri Block, Nepli Range, during 2021-22
Construction of Retaining wall along with main kacha road in Lower Gharari Beat, Ghareri Block, Nepli Range during 2021-22
Repair of Causeway on main road in Ghareri Beat, Gharerii Block, Nepli Range during 2021-22
Repair of Well wall & installation of shed located near Ghareri forest nursery in Upper Ghareri Beat, Ghareri Block in Nepli range during 2021-22
Construction of revetment in Upper Ghareri Beat, Ghreri Block, Nepli Range, during 2021-22
Construction of revetment RHS in Ghareri Beat near CAMPA Plot in Upper Ghareri Beat, Ghareri Block, Nepli Range during 2021-22
Detailed estimate for construction of revetment in Upper Ghareri Beat, Ghreri Block, Nepli Range, during 2021-22
Construction of revetment in Lower Ghareri Beat, Ghreri Block, Nepli Range, during 2021-22
Construction of grade stabilizer in Ghareri main choe in Lower Ghareri beat, Ghareri block in Nepli range during 2021-22
Repair of Chotikalan Dam No. 1 in Uppera Ghareri Beat, Ghareri Block Nepli Range during 2021-22
JAMEEL KHAN AND COMPANY
NAVPREET SINGH AND COMPANY
ABDUL GAFUR AND COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .