| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.9 LAdmitted-Finance | -28.13% | ₹35.9 L | L1 | Admitted-Finance |
| 2 | L2₹39.5 L+₹3.5 L (9.82%)Admitted-Finance | -21.07% | ₹39.5 L+₹3.5 L (9.82%) | L2 | Admitted-Finance |
| 3 | L3₹42.5 L+₹6.6 L (18.3%)Admitted-Finance | -14.99% | ₹42.5 L+₹6.6 L (18.3%) | L3 | Admitted-Finance |
| 4 | L4₹46.5 L+₹10.6 L (29.4%)Admitted-Finance | -7.02% | ₹46.5 L+₹10.6 L (29.4%) | L4 | Admitted-Finance |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
13 Aug 2026, 6:00 pmClosed
EO SAGWARA
NAGAR PALIKA SAGWARA
Rate contract work for drain crossing and repair in municipal area (Financial Year 2026 -27)
2026_DLB_581536_1
7384
Open Tender
Civil Works
Percentage
sagwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO SAGWARA
₹1 L
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer Rubble stone masonry in cement mortar. | 1 | cum | 386 | ₹386 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the
excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable
site as per direction of Engineer for following depths, below natural
ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 1 | cum | 229.5 | ₹229.5 |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth | 1 | Cum | 161.51 | ₹161.51 |
| 4 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a
prepared sub-grade with coarse and fine aggregate conforming to
IS: 383, the size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1, aggregate gradation
after blending to be as per table 600-1, cement content not to be
less than 150 kg/ cum, optimum moisture content to be determined
during trial length construction, concrete strength not to be less than
10 Mpa at 7 days, mixed in concrete mixer, laid manually,
compacted with surface vibrator, finishing and curing complete as
per clause 601, 112 of MoRT&H specification including all material,
labour, machinery, lighting, guarding and maintenance of diversion. | 1 | CUM | 2,955 | ₹2,955 |
| 5 | Providing, laying and compacting plain/ reinforced cement concrete
of specified grade in foundation/ leveling course/ pile cap using
concrete mixer and vibrater complete including cost of form work, as
per drawing and technical specifications and as per clause 1100,
1500,1700,2100 of MoRT&H specification including all scaffolding
material, labour, machinery. PCC M-20 | 1 | Cum | 5,880 | ₹5,880 |
| 6 | Providing and Laying Reinforced cement concrete pipe NP4/
prestrssed concrete pipe for culverts including jointing ends and
fixing collar with cement mortar 1:2 complete as per clause 1000 &
2900 of MoRT&H specification including all material, labour form
work, machinery. 300 mm internal diameter | 1 | Rmt | 1,187 | ₹1,187 |
| 7 | Providing and Laying Reinforced cement concrete pipe NP4/
prestrssed concrete pipe for culverts including jointing ends and
fixing collar with cement mortar 1:2 complete as per clause 1000 &
2900 of MoRT&H specification including all material, labour form
work, machinery. 450 mm internal diameter | - | Rmt | 2,135 | - |
| 8 | Cement plastering including T&P, scaffolding, material and complete
labpour, including cost of water, curing, racking of joints etc. with 15
mm cement plaster on the rough side of single or half brick wall of
mix : 1:6 (1 cement : 6 fine/ coarse sand) | - | Cum | 247 | - |
| 9 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | - | Kg | 144.5 | - |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | - | sqm | 236.5 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1033268.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .