Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.7 LAccepted-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹70.8 L+₹2.0 L (2.89%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹73.9 L+₹5.1 L (7.49%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹77.3 L+₹8.6 L (12.5%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
₹70.5 L
EMD Value
₹1.4 L
Closing Date
6 Jul 2022, 3:00 pmClosed
AGM (E-C)
Operational Offices, AAI, Chennai Airport, Chennai
Construction of warehouse for relocating the duty free goods at Chennai Airport, Chennai
2022_AAI_120389_1
AAI/CHAP/ENGG(C)/WAREHOUSE/001
Open Tender
Civil Works
Item Rate
120 days
Chennai Airport
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,180
₹1.4 L
5 Aug 2022
28 Jun 2022
7 Jul 2022
29 Jun 2022
6 Jul 2022
29 Jun 2022
29 Jun 2022 - 1 Jul 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) a) All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. a) All kinds of soil
P/L PCC - All work up to plinth level : a) 1:2:4
P/L PCC - All work up to plinth level : a) 1:5:10
Centering and shuttering - a) Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering - b) Suspended floors, roofs, landings, balconies and access platform
Centering and shuttering - c) Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering - d) Columns, piers, abutments, pillars, posts and struts
Steel reinforcement for R.C.C. work upto plinth level. b) Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work above plinth level. b) Thermo-Mechanically Treated bars of grade Fe-500D or more.
P/L in position ready mixed M-25 grade concrete for reinforced cement concrete work,a)All works upto plinth level
P/L in position ready mixed M-25 RCC b) All works above plinth level upto floor V level
B/W with common burnt clay F.P.S. a) Cement mortar 1:4
B/W with clay flyash F.P.S. a) Cement mortar 1:4
Providing wood work in frames of doors, windows, etc., a) Second class teak wood
P/F ISI marked flush door shutters a) 35 mm thick.
P/F aluminium die cast body tubular type universal hydraulic door closer.
P/f aluminium sliding door bolts: a) 300x16 mm
P/F aluminium tower bolts, a) 300x10 mm
P/F aluminium handles, a) 125 mm
P/F aluminium hanging floor door stopper, A) Single rubber stopper
62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 and top layer 12mm thick cement hardener consisting of mix 1:2
P/F on wall face unplasticised Rigid PVC rain water pipes (i) Single socketed pipes. 110mm dia
12 mm cement plaster of mix : 1:4
18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 finished with a top layer 6 mm thick cement plaster 1:6
6 mm cement plaster of mix : 1:3
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer a) Two or more coats applied on walls and including one coat of Special primer
Applying priming coat: a) With ready mixed pink or Grey primer
Painting with synthetic enamel paint a) Two or more coats on new work
Demolishing cement concrete a) Nominal concrete 1:3:6 or richer mix
Demolishing cement concrete a) Nominal concrete 1:4:8 or leaner mix
P/F aluminium work for doors, windows, (i) For fixed portion a) Anodised aluminium
P/F aluminium work for doors, windows, (ii) For shutters of doors, windows. a) Anodised aluminium
P/F glazing in aluminium door, window: a) With float glass panes of 4.0 mm thickness
P/L integral cement based water proofing treatment
P/L cooled glazed floor tiles of size 300x300 mm
Supplying and filling in plinth with M sand under floors
Providing design and structural drawings and working drawings
CIVICONS CONSULTANTS AND ENGINEERS
S.Srinivasan
B.M.J CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .