Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-Finance VILLAGE CHAKNOL P O DEORI KHANETI TEHSIL KOTKHAI DISTT SHIMLA H P | KOTKHAI | SHIMLA | HIMACHAL PRADESH | L1 | Accepted-Finance Accept | |
| 2 | L2₹16.9 L+₹18,090 (1.08%)Rejected-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | BILASPUR | HIMACHAL PRADESH | 174001 | L2 | Rejected-Finance Reject | |
| 3 | L3₹17.1 L+₹38,489 (2.30%)Rejected-Finance | L3 | Rejected-Finance Reject | |
| 4 | L4₹20.2 L+₹3.4 L (20.4%)Rejected-Finance | L4 | Rejected-Finance Reject | |
| 5 | L5₹20.2 L+₹3.4 L (20.5%)Rejected-Finance | L5 | Rejected-Finance Reject |
Tender Value
₹19.2 L
EMD Value
₹39,000
Closing Date
20 Jun 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer
CO Repair of link Jahu to Hour via GSSS Jahu km 000 to 1500 SH PL interlocking paver block km 0 00 to 0 350
2026_PWD_136625_7
3039-79 dated 10-06-2026
Open Tender
Civil Works - Roads
Percentage
Bhoranj
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹39,000
10 Jul 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
20 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering- All work up to plinth level: 1:4:8 (one Cement : four Coarse Sand) eight Graded Stone aggregate 40 mm nominal size) including entire carriage of materials in all leads and lifts. including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 81.5 | Per cubic meter | 4,700 | ₹3,83,050 |
| 2 | Providing and laying heavy duty precast cement concrete interlocking paver blocks vibro compacted upto M-50(M-fifty) grade including border or kurb block grey or coloured over sub base of concrete with 25mm (twenty millimeters) thick average thickness of cement 1:4 (one cement: four sand) laid over and jointed with neat cement slurry mixed with pigment to match the shade of blocks including curing rubbing and polishing complete (sub base concrete) floor to be paid for 80mm( eighty millimeters) thick inter locking blocks (ISI approved), and as per direction of the Engineer-in-charge including entire carriage of materials within all leads and lifts including entire carrriage of material within all leads and lifts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government | 1,085 | Per Square Meter | 1,200 | ₹13,02,000 |
| 3 | Providing and laying mechanically mixed cement concrete( M-20 )(M-twenty ) 1:2:4 one cement : two sand : four graded crushed stone aggregate) 20mm(twenty millimeters) for plain /reinforcement concrete in open foundation complete including cost of form work steel plate complete as per drawings and technical specification Clause 802, 803 1202 & 1204 including entire carrriage of material within all leads and lifts and other incidentals . The rates are inclusive octrol, royality, Malkana, toll tax,sale tax or other taxes imposed by the Government. | 42 | Per Cubic Meter | 5,700 | ₹2,39,400 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.70 MB
SBD7.pdf
Tender Documents • 5.06 MB
BOQ_202221.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .