Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.3 L+₹9,951.20 (2.35%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
18 Jul 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Civil TTPS
Office of the SE Civil TTPS TTN 4
Rectification works to the 120 Ton Weigh Bridge Civil Structures near SCH 2 area at TTPS
2024_EB_458336_1
CE SE C TTPS Spec. No 140 24 25
Open Tender
Civil Works - Others
Item Rate
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,500
Yes
12 Sept 2024
29 Jun 2024
19 Jul 2024
29 Jun 2024
18 Jul 2024
29 Jun 2024
Dismantling the existing RCC for the required width & depth as per the instructions of engineer in charge including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing PCC 1:3:6 using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Labour charges for cutting, welding, fabrication & laying in position of the MS beam & angle including cost of labour charges, cutting, fabrication charges, lead, lift, etc., complete. (MS Scrap will be supplied by Dept. at free of cost)
Supplying & providing the conbextra GP2 or equivalent of 25Kg bag and mixed with of proper cement ration and mixed with 25 % of 6mm metal as per the instruction of engineer rate including cost of all materials, welding, shuttering arrangements, labour, lead, lift, hire charges for machine etc., complete.
Supplying and providing Nito floor Hard top over the existing PCC/ RCC concrete surface of 5Kg/Sqm and rubbed smooth with power float over the base concrete including cost of all materials, labour, lead, lift, etc., complete.
UDAYAPPA ENTERPRISES (BID ID -1081762)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .