| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹84.5 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹97.1 Cr+₹12.6 Cr (14.9%)Admitted-Finance 592 WELCOME TOWER MODI COLLEGE ROAD DADABARI EXT KOTA 324009 | KOTA | KOTA | RAJASTHAN | 324009 | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Non-Responsive due to item no. 10 (b) M/s JDCC experience in satisfactory least one work not completed |
Tender Value
₹93.0 Cr
EMD Value
₹93.0 L
Closing Date
12 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Widening and Strengthening Sunel to Karodiya, Unhel to Osav to Pirawa via Odiya Kherito Kotri to Govindpura,Karawan via Dhaturiya, Bani,Singhpura up to MP Border from Km 00/00 to 12/00, 17/200 to 26/00, 29/600 to 61/150 and 70/500 to 77/050 (MDR-377)
2025_CEPWD_494240_1
ACE PWD ZONE KOTA NITNO-21/2025-26
Open Tender
Civil Works
Percentage
540 days
JHALAWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
50000 EE PWD DIV. JHALAWAR
₹93.0 L
3 Oct 2025
14 Aug 2025
16 Sept 2025
14 Aug 2025
12 Sept 2025
14 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle | 66.57 | Hectare | - | - |
| 2 | Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 3,083.49 | Cum | - | - |
| 3 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 41,764.8 | Cum | - | - |
| 4 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 3,77,373.04 | Cum | - | - |
| 5 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge | 4,17,160.54 | Cum | 1 | ₹4,16,743.38 |
| 6 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-II Material | 38,942.35 | Cum | - | - |
| 7 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 39,787.5 | Cum | - | - |
| 8 | Supply & Planting of shady plants ( Neem, Peepal, Goolar, Jamun, Imli or other specified ) along road side including the following activities:- 1. Preparation of soil including cleaning & removing of unwanted shrubs removal of stones & garbage. 2. Supply of plant at site of two years of age & height more than 1.50 Mtr 3. Supply of dry manure ( Farm yard manure organic ) 4. Supply of Insecticides 5. Digging of pits size 60x60x60 cms. Including removal of stones. Manuring application of insecticides & watering at least 15 liter per plant after planting. 6. Half brick Circular tree guard in second class bricks, internal dia 1.25 meter and height 1.20 meter above ground and 0.20 meter below ground, bottom two courses laid dry and top three courses in cement mortar 1:6 (1Cement : 6 Sand) and the intermediate courses being in dry honey comb masonry, as per design complete. 7. Watering to plants. 8.Maintenance of plants by the contractor including of pits/bids preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security. If the plant die during maintenance contractor has to replace same height plant at his own cost. Note:- SD Shall be refunded after counting of plants on completion of defect liability period of 5 years | 8,453 | P.Plant | - | - |
| 9 | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with all lead | 83,314.88 | Cum | - | - |
| 10 | Extra rate for carriage of mixed material additional lead from in item 4.6 Extra rate for carriage of mixed material additional all lead | 83,314.88 | Cum | 1 | ₹83,231.57 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.05 MB
03-MDR-377-SBDPart-01.pdf
Tender Documents • 0.76 MB
BOQ_881299.xls
BOQ • 0.32 MB
03-MDR-377-SBDPart-02.pdf
Tender Documents • 16.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .