| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.0 LAdmitted-Finance | ₹64.0 L | L1 | Admitted-Finance |
| 2 | L2₹64.7 LAdmitted-Finance | ₹64.7 L | L2 | Admitted-Finance |
| 3 | L3₹66.3 LAdmitted-Finance | ₹66.3 L | L3 | Admitted-Finance |
| 4 | L4₹70.2 LAdmitted-Finance 565 566 ANNA NAGAR HOUSING UNIT II PONGALUR ROAD VEERAKERALAM SUGERCANE INSTITUTE POST COIMBATORE 641007 | COIMBATORE | COIMBATORE | TAMIL NADU | 641007 | ₹70.2 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical BQR not Satisfied |
| Sl No | Description | Qty | Unit | SREE SRINIVASA ASSOCIATES L4 | Sudharshan Constructions L2 | NEWBHARATH ELECTRICALS AND ENTERPRISES L1 | SRV ELECTRIC WORKS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench. | 60 | M | 9,600 ₹9,600 | 9,900 ₹9,900 | 9,000 ₹9,000 Lowest | 9,600 ₹9,600 |
| 2.00 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 38 | M3 | 20,140 ₹20,140 | 19,950 ₹19,950 | 18,620 ₹18,620 Lowest | 19,760 ₹19,760 |
| 3.00Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without cable laying work including lead, lift, labour, hinderence to the tools & plants etc., complete as per direction of Engineer-in-charge. | |||||||
| 3.01 | Dismantling BW in CM - 1cum | 2 | M3 | 1,200 ₹1,200 | 1,100 ₹1,100 | 1,000 ₹1,000 Lowest | 1,200 ₹1,200 |
| 3.02 | Dismantling PCC - 1cum | 2 | M3 | 4,200 ₹4,200 | 4,000 ₹4,000 Lowest | 4,000 ₹4,000 Lowest | 4,400 ₹4,400 |
| 3.03 | Dismantling RCC - 1cum | 5 | M3 | 22,500 ₹22,500 | 17,500 ₹17,500 Lowest | 20,000 ₹20,000 | 22,000 ₹22,000 |
| 4.00 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 1,373 | CKTM | 54,92,000 ₹54,92,000 | 51,14,425 ₹51,14,425 | 50,80,100 ₹50,80,100 Lowest | 52,17,400 ₹52,17,400 |
| 5.00 | Providing barricading works for laying cables using steel barricades with green barricade construction safety nets continously without gap inclusive material cost, labour and removal charges after completing the work etc charges complete and warning tape as directed by the engineer at site. | 120 | M | 30,000 ₹30,000 | 15,000 ₹15,000 | 12,000 ₹12,000 Lowest | 18,000 ₹18,000 |
| 6.00 | Supplying and laying of 140 mm dia HDPE pipes,cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P etc., complete | 30 | M | 30,000 ₹30,000 | 25,500 ₹25,500 | 24,000 ₹24,000 Lowest | 25,500 ₹25,500 |
| 7.00 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per materials, labour, lead, lift etc., complete. | 8.1 | M3 | 49,815 ₹49,815 | 48,600 ₹48,600 | 44,550 ₹44,550 Lowest | 45,360 ₹45,360 |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
6 Aug 2026, 3:00 pmClosed
SE CDC TNPDCL
A10 Thiru Vi Ka Industrial Estate Guindy
Work contract for Laying of 33KV1x630 sq.mm XLPE UG Cable2 nd Sourcefrom TondiarpetTH Road/33 KV SS to Tondiarpet EV
2026_EB_687440_1
OTNo04/2026-27
Open Tender
Civil Works
Works
90 days
A10 Thiru Vi Ka Industrial Estate Guindy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹36,000
Yes
21 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench. | 60 | M | - | - |
| 2 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 38 | M3 | - | - |
| 3Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without cable laying work including lead, lift, labour, hinderence to the tools & plants etc., complete as per direction of Engineer-in-charge. | |||||
| 3.01 | Dismantling BW in CM - 1cum | 2 | M3 | - | - |
| 3.02 | Dismantling PCC - 1cum | 2 | M3 | - | - |
| 3.03 | Dismantling RCC - 1cum | 5 | M3 | - | - |
| 4 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 1,373 | CKTM | - | - |
| 5 | Providing barricading works for laying cables using steel barricades with green barricade construction safety nets continously without gap inclusive material cost, labour and removal charges after completing the work etc charges complete and warning tape as directed by the engineer at site. | 120 | M | - | - |
| 6 | Supplying and laying of 140 mm dia HDPE pipes,cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P etc., complete | 30 | M | - | - |
| 7 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per materials, labour, lead, lift etc., complete. | 8.1 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 0.73 MB
BOQ_826267.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].