Loading…
Loading…
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
9 Jun 2026, 4:00 pm4d left
Executive Engineer rnb Beerwah
office of the Executive Engineer rnb Beerwah
Upgradation of link road from NTR (RHS) near Axis bank at Magam
2026_PWDJK_311389_2
NIT NO.13 of 2026-27
Open Tender
Civil Works
10 days
Beerwah
as per nit
2 documents required · 2 mandatory
₹600
Executive Engineer rnb Beerwah
₹24,000
Yes
2 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 108 | Sqm | 24.12 | ₹2,604.96 |
| 2 | Providing and laying of stone soling in trenches hand packed all inclusive leads, lifts, loading, unloading, head load, ramming/ dressing and carriage of materials from approved nearest sources to site of work complete. | 42.3 | Cum | 1,000 | ₹42,300 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 36.06 | Cum | 5,202.9 | ₹1,87,616.57 |
| 4 | Providing and laying 80mm thick factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. incl. all carraiges complete job as per direction of Engineer-in-charge. | 390 | Sqm | 1,430 | ₹5,57,700 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 46.93 | Cum | 6,591.25 | ₹3,09,327.36 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 134.75 | Sqm | 286.35 | ₹38,585.66 |
| 7 | Providing and laying watering and compacting with (80-100)KN road roller nallah muck/RBM/khak filling having agg. Size not exceeding 90mm granular sub base material to specified lines, grades , cross sections all inclusive leads, lifts, loading, unloading with all carriage complete job | 22.99 | Cum | 1,000 | ₹22,990 |
| 8Carriage of materials by M T incl. loading,unloading etc. all complete job. | |||||
| 8.01 | Stone Aggregates 40mm for an Av. Lead 12 Kms | 32.45 | CUM | 331.8 | ₹10,766.91 |
| 8.02 | Stone Aggregates 40mm below for an Av. Lead 12 Kms | 42.23 | CUM | 305.22 | ₹12,889.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1008308.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid