Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.7 LAccepted-Finance | ₹19.7 L | 1 | Accepted-Finance lowest bid rate |
| 2 | 2₹20.0 LRejected-Finance 1 306 LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹20.0 L | 2 | Rejected-Finance higher bid rate |
| 3 | 3₹20.4 LRejected-Finance 1 306 VISHAL KHAND GOMTI NAGAR LUCKNOW | GHAZIABAD | UTTAR PRADESH | 201001 | ₹20.4 L | 3 | Rejected-Finance higher bid rate |
| Sl No | Description | Qty | Unit | SHAILESH SINGH L1 | MANJULA MISHRA L3 | M/S S S ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Installing new Main Roller Assembly with new Bearing including cost of all material, labour and T&P required for proper completion of work at Guntanala Dam. The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 6 | Job | 1,47,098 ₹8,82,588 Lowest | 1,52,210 ₹9,13,260 | 1,50,590 ₹9,03,540 |
| 2.00 | Repairing of winch Machine by dismantling, opening removing old grease from GM bush cleaning, greaseing and refitting including cost of all material, labour & T&P required for completion of work Guntanala Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 6 | Job | 23,297 ₹1,39,782 Lowest | 23,880 ₹1,43,280 | 23,585 ₹1,41,510 |
| 3.00 | Renovation of guide pulley assembly by repairing and greasing of worn out axle of guide pulley after detaching from gate and dismantling of guide pulley accessories and refitting in gate properly and testing including cost of all material labour and T & P etc. for proper completion of work.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 12 | Job | 37,155 ₹4,45,860 Lowest | 38,980 ₹4,67,760 | 38,200 ₹4,58,400 |
| 4.00 | Supply & Installation of Tata Power make RISHABH PowerGenerator- DG set of 20 AMF Control Panel at Guntanala dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 1 | Set. | 4,99,232 ₹4,99,232 Lowest | 5,10,745 ₹5,10,745 | 5,01,290 ₹5,01,290 |
Tender Value
Refer Docs
EMD Value
₹41,500
Closing Date
3 Jun 2026, 10:00 amClosed
Executive Engineer
Office of Executive Engineer, Barrage Mechanical Maintenance Division, Kanpur, Irrigation Department U.P., 67-A, Cantt, Kanpur-208004
Repairing of winch Machine,guide pulley assembly and Installing new Main Roller Assembly,power Generator at Guntanala Dam, Chitrakoot
2026_UPIDM_1153134_1
22/EE/BMMDK/2026-27 (LOT-3)
Open Tender
Miscellaneous Works
Fixed-rate
240 days
Guntanala Dam, Chitrkoot
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹41,500
17 Aug 2026
25 May 2026
3 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installing new Main Roller Assembly with new Bearing including cost of all material, labour and T&P required for proper completion of work at Guntanala Dam. The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 6 | Job | - | - |
| 2 | Repairing of winch Machine by dismantling, opening removing old grease from GM bush cleaning, greaseing and refitting including cost of all material, labour & T&P required for completion of work Guntanala Dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 6 | Job | - | - |
| 3 | Renovation of guide pulley assembly by repairing and greasing of worn out axle of guide pulley after detaching from gate and dismantling of guide pulley accessories and refitting in gate properly and testing including cost of all material labour and T & P etc. for proper completion of work.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 12 | Job | - | - |
| 4 | Supply & Installation of Tata Power make RISHABH PowerGenerator- DG set of 20 AMF Control Panel at Guntanala dam.The work shall be carried out according to the specification and as per direction of the Engineer-in-Charge. (G.S.T. will be paid extra as per Government norms) . | 1 | Set. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_2160218.xls
BOQ • 0.24 MB
TD22Lot-3.pdf
Tender Documents • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].